My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-28 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2015
>
2015-10-28 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2015 4:35:35 PM
Creation date
10/23/2015 4:33:16 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRAUN' LOG OF BORING <br /> INTERTEC <br /> Braun Project SP-07-03738 BORING: ST-20 <br /> Geotechnical Evaluation <br /> 2009 Street& Utility Improvement Project LOCATION: See attach sketch <br /> City of Centerville <br /> Centerville, Minnesota <br /> DRILLER: ).Chermak METHOD: 3 t/4"HSA,Autohmr DATE: 10/29/07 SCALE: V=4' <br /> Depth <br /> feet ASTM Description of Materials BPF WL Tests or Notes <br /> 0.0 Symbol (ASTM D2488 or D2487) <br /> PAV 5 1/2"Bituminous over 10"Aggregate Base <br /> 1.3 <br /> CL. SANDY LEAN CLAY,trace of Gravel,light brown,wet,rather <br /> soft. <br /> (Glacial Till) 5 <br /> h 6.0 5 <br /> s END OF BORING <br /> b <br /> Water not observed with 4 112 feet of hollow-stem auger in the <br /> nground <br /> 0 <br /> c Water not observed to cave-in depth of 4 feet immediately after <br /> M withdrawal of auger <br /> b <br /> % Boring then backfilled <br /> u <br /> .3 <br /> u <br /> td <br /> r <br /> N <br /> O <br /> O <br /> URG <br /> i... <br /> Q <br /> n <br /> N <br /> t� <br /> m <br /> 0 <br /> d <br /> h <br /> 0 <br /> m <br /> m <br /> SP-07-03739 Braun Intenec Corporation— <br /> ST-20 <br /> page i of i <br /> 73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.