My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-28 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2015
>
2015-10-28 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2015 4:35:35 PM
Creation date
10/23/2015 4:33:16 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRAUN"' LOG OF BORING <br /> INTERTEC <br /> Braun Project SP-07-03738 BORING: ST-22 <br /> Geotechnical Evaluation <br /> 2009 Street&Utility Improvement Project LOCATION. See attach sketch. <br /> City of Centerville <br /> Centerville, Minnesota <br /> DRILLER: ) Chennak METHOD: 3 l/4"HSA,AutohmrDATL lOR9/07 SCALE ]"=4' <br /> Depth <br /> feetJAS Description of Materials BPF WL Tests or Notes <br /> 0.0 Symbol. (ASTM D2488 or D2487) <br /> 5"Bituminous over 10"Aggregate Base. <br /> l.3 <br /> FILL: Silty Sand,dark brown,moist. <br /> G <br /> 4.0 <br /> CLAYEY SAND,trace of Gravel,light brown,wet,rather soft <br /> (Glacial Till) <br /> K 6.0 4 <br /> o END OF BORING <br /> h <br /> Water not observed with 4 1/2 feet of hollow-stem auger in the <br /> ground. <br /> 0 <br /> Water not observed to cave-in depth of 4 feet immediately after <br /> a withdrawal of auger <br /> Boring then backfilled. <br /> u <br /> N <br /> G <br /> L� <br /> Q <br /> d <br /> M <br /> N <br /> f <br /> t•J <br /> Q. <br /> W <br /> h <br /> m <br /> 0 <br /> s <br /> SN 7-03738 Braun Intettec corporation ST-22 page 1 of 1 <br /> 75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.