My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-28 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2015
>
2015-10-28 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2015 4:35:35 PM
Creation date
10/23/2015 4:33:16 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRAUN"' LOG OF BORING <br /> INTERTEC <br /> Braun Project SP-07-03738 BORING: ST-39 <br /> Geotechnical Evaluation LOCATION: See attach sketch <br /> 2009 Street &Utility Improvement Project <br /> City of Centerville <br /> Centerville,Minnesota <br /> DRILLER: I Chcrmak METHOD: 3 1/4"LISA,Autohmr DATE: 10/30/07 SCALE: I"=4' <br /> Depth <br /> feet ASTM Description of Materials BPF WL Tests or Notes <br /> 0.0 Symbol (ASTM D2488 or D2487) <br /> PAV 4 1/2"Bituminous over 8"Aggregate Base. <br /> 1.1 <br /> FILL FILL: Sandy Lean Clay,brown and gray,wet. <br /> 7 <br /> 3 <br /> y 6.0 <br /> `o END OF BORING. <br /> Water not observed with 4 1/2 feet of hollow-stem auger in the <br /> ground. <br /> Water not observed to cave-in depth of 4 feet immediately after <br /> withdrawal of auger. <br /> Boring then backfilled <br /> u <br /> w <br /> u <br /> N <br /> O <br /> G <br /> F <br /> Z <br /> M <br /> hu% <br /> M <br /> A <br /> h <br /> 4h <br /> r <br /> h <br /> V <br /> m <br /> P <br /> UK <br /> O <br /> O <br /> N <br /> 90H <br /> 6 <br /> Z� <br /> 7 <br /> SP-07-03738 Braun Intenec Corporation ST-39 page 1 of 1 <br /> 92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.