My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-04 P & R Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2015
>
2015-11-04 P & R Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2015 1:12:21 PM
Creation date
10/30/2015 1:11:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOUNDARIES • • COSTS <br /> City of Lino Lakes and Laurie LaMotte Memorial Park in the City of Centerville. <br /> The trail is proposed to be an eight to ten foot wide paved trail. Working west to east,as shown in Figure 3, <br /> Exhibit A, the existing trail leaves Bunker Hills Regional Park from the south east corner of the park, just <br /> north of Blaine High School. It crosses to the south side of Bengal Drive and heads east as an eight foot wide <br /> striped on-road bicycle lane. At Jefferson Street the trail changes to a ten foot wide grade separated paved <br /> trail behind the curb and travels south on the west side of the street. At the intersection of Jefferson Street <br /> and CSAH 14/Main Street,the trail crosses at the signalized intersection to the south side of CSAH 14/Main <br /> Street and travels east,crossing over Highway 65 and currently ending at Aberdeen Street. From Aberdeen <br /> Street,the proposed trail is to be a ten foot wide grade separated paved trail that follows on the south side <br /> of CSAH 14/Main Street to Cloud Drive. This stretch is just over a mile long and would potentially impact 22 <br /> 14 <br /> EXISTI NG BUNKER-CHAIN OF <br /> LIKES REGIONALTRAIL ( ! <br /> PROPOSED BUNKER-CHAIN OF <br /> LIKES REGIONALTRAIL (( <br /> SCHOOL y>,. <br /> ASSISTED UVING FACILITY • ,,,nom <br /> © LIBRARY <br /> EXISTINGREGIONALTRAIL - - <br /> ••PROPOSED REGIONAL TRAIL • �_.y, ?�� - <br /> -__ ROADNAY <br /> EXISTING CITY TRAIL <br /> PROPOSED CITY TRAIL <br /> QTY PARK <br /> REGIONAL PARK,REGIONAL - <br /> TRAIL CORRIDOR <br /> NMTER <br /> Bunker- Chain of Lakes Regional Trail Alignment <br /> Figure 3 Exhibit A <br /> parcels. If right of way or easements are needed,it is estimated that the width of those easements may be <br /> between 15 and 20 feet. It is anticipated that the trail along this stretch will be completed within the next <br /> 5-7 years. <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.