3.22 Modifications,additions, structural alterations, normal maintenance and repair,or repair
<br /> after damage to existing nonconforming structures and nonconforming uses of structures or
<br /> land are regulated by the general provisions of this ordinance and specifically Section 11.0.
<br /> 3.23 All structures must be constructed with electrical, heating,ventilation, plumbing,and air
<br /> conditioning equipment and other service facilities that are designed and/or located so as to
<br /> prevent water from entering or accumulating within the components during conditions of
<br /> flooding to the Base Flood Elevation.
<br /> 3.24 As-built elevations for elevated or floodproofed structures must be certified by ground
<br /> surveys and flood-proofing techniques must be designed and certified by a registered
<br /> professional engineer or architect as specified in the general provisions of this ordinance and
<br /> specifically as stated in Section 10.0 of this ordinance.
<br /> SECTION 4.0 FLOODWAY DISTRICT(FW)
<br /> 4.1 Permitted Uses: The following uses, subject to the standards set forth in Section 4.2,are permitted
<br /> uses if otherwise allowed in the underlying zoning district or any applicable overlay district:
<br /> 4.11 General farming, pasture,grazing, outdoor plant nurseries, horticulture,truck farming,
<br /> forestry,sod farming,and wild crop harvesting.
<br /> 4.12 Industrial-commercial loading areas, parking areas, and airport landing strips.
<br /> 4.13 Open space uses, including but not limited to private and public golf courses,tennis courts,
<br /> driving ranges, archery ranges, picnic grounds, boat launching ramps, swimming areas, parks,
<br /> wildlife and nature preserves,game farms,fish hatcheries, shooting preserves, hunting and
<br /> fishing areas, and single or multiple purpose recreational trails.
<br /> 4.14 Residential lawns,gardens, parking areas,and play areas.
<br /> 4.15 Railroads, streets, bridges, utility transmission lines and pipelines, provided that the
<br /> Department of Natural Resources'Area Hydrologist is notified at least ten days prior to
<br /> issuance of any permit, and that the standards in Sections 4.41,4.43(a)and 4.46 of this
<br /> ordinance are met.
<br /> 4.2 Standards for Floodway Permitted Uses:
<br /> 4.21 The use must have a low flood damage potential.
<br /> 4.22 With the exception of the uses listed in Section 4.15,the use must not obstruct flood flows or
<br /> increase flood elevations and must not involve structures,fill, obstructions,excavations or
<br /> storage of materials or equipment.
<br /> 4.23 Any facility that will be used by employees or the general public must be designed with a
<br /> flood warning system that provides adequate time for evacuation if the area is inundated to a
<br /> depth and velocity such that the depth (in feet) multiplied by the velocity(in feet per second)
<br /> would exceed a product of four upon occurrence of the regional (1%chance)flood.
<br /> 4.3 Conditional Uses: The following uses may be allowed as conditional uses following the standards
<br /> and procedures set forth in Section 10.4 of this ordinance and further subject to the standards set
<br /> forth in Section 4.4, if otherwise allowed in the underlying zoning district or any applicable overlay
<br /> district.
<br /> 4.31 Structures accessory to the uses listed in 4.1 above and the uses listed in 4.32 -4.37 below.
<br /> 4.32 Extraction and storage of sand,gravel,and other materials.
<br /> 4.33 Marinas, boat rentals,docks, piers, wharves, and water control structures.
<br /> August 2015 6