Laserfiche WebLink
F. agree at the time of submitting its Bid that no further examinations, investigations, <br /> explorations, tests,studies, or data are necessary for the determination of its Bid for <br /> performance of the Work at the price(s) Bid and within the times required, and in <br /> accordance with the other terms and conditions of the Bidding Documents; <br /> G. become aware of the general nature of the work to be performed by Owner and others <br /> at the Site that relates to the Work as indicated in the Bidding Documents; <br /> H. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies <br /> that Bidder discovers in the Bidding Documents and confirm that the written resolution <br /> thereof by Engineer is acceptable to Bidder;and <br /> I. determine that the Bidding Documents are generally sufficient to indicate and convey <br /> understanding of all terms and conditions for the performance of the Work. <br /> 4.08 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder <br /> has complied with every requirement of this Article 4, that without exception the Bid is <br /> premised upon performing and furnishing the Work required by the Bidding Documents and <br /> applying any specific means, methods, techniques, sequences, and procedures of <br /> construction that may be shown or indicated or expressly required by the Bidding Documents, <br /> that Bidder has given Engineer written notice of all conflicts,errors, ambiguities, and <br /> discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions <br /> thereof by Engineer are acceptable to Bidder, and that the Bidding Documents are generally <br /> sufficient to indicate and convey understanding of all terms and conditions for performing and <br /> furnishing the Work. <br /> ARTICLES - PRE-BID CONFERENCE <br /> 5.01 There will be no Pre-Bid Conference. <br /> ARTICLE 6 -SITE AND OTHER AREAS <br /> 6.01 The Site is identified in the Bidding Documents. Easements for permanent structures or <br /> permanent changes in existing facilities are to be obtained and paid for by Owner, unless <br /> otherwise provided in the Bidding Documents. All additional lands and access thereto required <br /> for temporary construction facilities, construction equipment, or storage of materials and <br /> equipment to be incorporated in the Work are to be obtained and paid for by Contractor. <br /> ARTICLE 7 - INTERPRETATIONS AND ADDENDA <br /> 7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to <br /> Engineer in writing. Interpretations or clarifications considered necessary by Engineer in <br /> response to such questions will be issued by Addenda mailed or delivered to all parties <br /> recorded by Engineer as having received the Bidding Documents. Questions received less <br /> than 10 days prior to the date for Opening of Bids may not be answered.Only questions <br /> answered by Addenda will be binding. Oral and other interpretations or clarifications will be <br /> without legal effect. <br /> 7.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed <br /> advisable by Owner or Engineer. <br /> INSTRUCTIONS TO BIDDERS <br /> 0021 13-4 <br /> ©2015 Stantec 1 193803352 <br />