My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res. #15-036 - Approving Plans & Specs. & Ordering Ad. For Bids
Centerville
>
City Council
>
Resolutions
>
2000-2023
>
2015
>
Res. #15-036 - Approving Plans & Specs. & Ordering Ad. For Bids
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2015 9:10:24 AM
Creation date
11/10/2015 9:47:22 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
qualification prior to award of the Contract and attach such covenant to the Bid. Bidder's <br /> state contractor license number,if any, shall also be shown on the Bid Form. <br /> 13.12 Bidders shall indicate the total add or deduct to the Total Base Bid for each Alternate provided <br /> on the Bid Form. <br /> 13.13 Bidders may list proposed Substitute Items on the spaces provided on the Bid Form. Bidders <br /> shall clearly indicate the name, Specification Section number, and the total deduct to the <br /> Total Base Bid for each Substitute Item proposed. <br /> 13.14 Bidders shall identify the name of the subcontractor that will perform the listed portion of the <br /> Work if the Bidder is awarded the Contract. <br /> ARTICLE 14- BASIS OF BID; COMPARISON OF BIDS <br /> 14.01 Unit Price <br /> A. Bidders shall submit a Bid on a Bid Unit Price basis for each Bid Item of Work listed in the Bid <br /> Form. <br /> B. The total of all estimated prices will be the sum of the products of the estimated quantity of <br /> each Bid Item and the corresponding Bid Unit Price.The final quantities and Contract Price <br /> will be determined in accordance with Paragraph 11.03 of the General Conditions. <br /> C. Discrepancies between the multiplication of units of work and Bid Unit Prices will be <br /> resolved in favor of the Bid Unit Prices. Discrepancies between the indicated sum of any <br /> column of figures and the correct sum thereof will be resolved in favor of the correct sum. <br /> D. Bids will be compared on the basis of the "Total Base Bid" and this amount will be the basis <br /> for determining the lowest Bidder. <br /> ARTICLE 15 - SUBMITTAL OF BID <br /> 15.01 Bid shall be submitted no later than the date and time prescribed and at the place indicated <br /> in the Advertisement or Invitation for Bids and shall be enclosed in a plainly marked package <br /> with the Project title (and, if applicable, the designated portion of the Project for which the Bid <br /> is submitted), the name and address of Bidder, and shall be accompanied by the Bid Security <br /> and other required documents. If a Bid is sent by mail or other delivery system, the sealed <br /> envelope containing the Bid shall be enclosed in a separate package plainly marked on the <br /> outside with the notation "BID ENCLOSED." A mailed Bid shall be addressed to Owner's office. <br /> 15.02 The Bid shall include the entire Document 00 41 10, Bid Form.This includes all attachments listed <br /> in Article 7.01 of the Bid Form and/or all forms included with the Bid Form.The Contractor may <br /> remove or copy these sheets from the Project Manual <br /> 15.03 The entire Project Manual should not be submitted with the Bid. <br /> ARTICLE 16 -MODIFICATION AND WITHDRAWAL OF BID <br /> 16.01 A Bid may be modified or withdrawn by an appropriate document duly executed in the same <br /> manner that a Bid must be executed and delivered to the place where Bids are to be <br /> submitted prior to the date and time for the Opening of Bids. <br /> 16.02 Bids may be withdrawn after Bid Opening only in accordance with the law. <br /> INSTRUCTIONS TO BIDDERS <br /> 0 2015 Stantec 1 193803352 0021 13-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.