Laserfiche WebLink
BRAUN"' LOG OF BORING <br /> INTERTEC <br /> Braun Project SP-07-03738 BOILING: ST-2 <br /> Geotechnical Evaluation L OCATION: See attach sketch. <br /> 2009 Street&Utility Improvement Project <br /> City of Centerville <br /> Centerville,Minnesota <br /> DRILLER: J Chermak METHOD: 3 1/4"HSA,Autohmr DATE: 10/25/07 SCALE: V=4' <br /> Depth <br /> feet ASTM Description of Materials BAT WL Tests or Notes <br /> 0.0 Symbol (ASTM D2488 or D2487) <br /> AAVJ 4"Bituminous over 12"Aggregate Base over Fabric. <br /> 1.3 <br /> PILL PILL: Clayey Sand,trace of Gravel,reddish-brown and brown, <br /> moist to wet. <br /> 9 <br /> 3 <br /> 6.0 <br /> o END OF BORING <br /> h <br /> Water not observed with 4 1/2 feel of hollow-stem auger in the <br /> JO ground <br /> Water not observed to cave-in depth of feet immediately after <br /> ° withdrawal of auger. <br /> id <br /> xBoring then backfilled. <br /> u <br /> W <br /> d <br /> Z <br /> H <br /> C <br /> 1.. <br /> V <br /> tJ <br /> v <br /> y <br /> M <br /> M <br /> N <br /> 0 <br /> u <br /> 6 <br /> m <br /> r <br /> no <br /> 0. <br /> N <br /> m <br /> U <br /> `7 <br /> K <br /> fn <br /> Sp-07.03739 Nam Intenec Corporation ST-2 page 1 of f <br />