Laserfiche WebLink
BRAUN"' LOG OF BORING <br /> INTERTEC <br /> Braun Project SP-07-03738 BORING: ST-7 <br /> Geotechnical Evaluation LOCATION: See attach sketch <br /> 2009 Street &Utility Improvement Project <br /> City of Centerville <br /> Centerville,Minnesota <br /> DRILLER: 3 Chermak METHOD: 3 I/4"HSA,Autohmr DATE: 10/27/07 SCALE: I"=4' <br /> Depth <br /> feet ASTM Description of Materials BPF WL Tests or Notes <br /> 0.0 Symbol (ASTM D2488 or D2487) <br /> PAV 4"Bituminous over 10"Aggregate Base <br /> 1.2 <br /> FILL FILL: Silty Sand,with Clayey Sand mix,trace of Gravel,dark <br /> gray,moist. <br /> 12 <br /> 6.0 A <br /> 10 <br /> c END OF BORING. <br /> Water not observed with 4 1/2 feet of hollow-stem auger in the <br /> ground. <br /> cWater not observed to cave-in depth of 4 feet immediately alter <br /> a <br /> withdrawal of auger. <br /> S Boring then backfilled. <br /> a, <br /> N <br /> O <br /> O <br /> F_ <br /> t" <br /> Q <br /> W <br /> W <br /> n <br /> r <br /> F <br /> V <br /> pm. <br /> U <br /> ae <br /> zqN <br /> S <br /> m <br /> 0 <br /> u <br /> 0 <br /> u <br /> m <br /> WL <br /> SP-07-03736 Braun intertec Corporation ST-7PaB e 1 of 1 <br />