Laserfiche WebLink
RAU LOG OF BORING <br /> INTERTEC <br /> Braun Project SP-07-03738 BORING: ST-39 <br /> Geotechnical Evaluation LOCATION: See attach sketch <br /> 7.009 Street &Utility Improvement Project <br /> City of Centerville <br /> Centerville,Minnesota <br /> DRILLER: 3 Chenmk METHOD: 3 1/4"HSA,Autohmr DATE: 10/30/07 SCALE: 1"=4' <br /> r <br /> ASTM Description of Materials BPF WL- Tests or Notes <br /> Symbol (ASTM D2488 or D2487) <br /> PAV 4 1/2"Bituminous over 8"Aggregate Base. <br /> FILL FILL: Sandy lean Clay,brown and gray, vet <br /> 7 <br /> 3 <br /> 6.0 <br /> `o END OF BORING. <br /> w <br /> Water not observed with 4 1/2 feet of hollow-stem auger in the <br /> ground <br /> e Water not observed to cave-in depth of 4 feet immediately alter <br /> a withdrawal of auger_ <br /> =° Boring then backfilled <br /> w <br /> as <br /> r <br /> Vl <br /> LY <br /> r <br /> 7 <br /> H <br /> N <br /> V <br /> M <br /> h <br /> r <br /> N <br /> y�C <br /> J4 <br /> 6 <br /> 0. <br /> u <br /> is <br /> N <br /> m <br /> O <br /> V <br /> 6 <br /> Z� <br /> 7 <br /> fD Braun Intenec Corporation ST-39 page 1 of t <br /> SP-07-03738 <br />