Laserfiche WebLink
Figure 1-1 of the TPP jj <br /> Principal Arterials <br /> 0'+*.p Principal Arterial-Existing <br /> 'A <br /> 4 <br /> 'Pkm Principal Arterial-Under Construction <br /> Y <br /> A <br /> Reference Items <br /> Lakes and Rivers <br /> F, City Boundary <br /> County Boundary <br /> MUSA 2040 <br /> MPO Area 0 5 10 a 20 Miles Nov 2014 <br /> 2040 TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL <br /> Figure 1-1 <br /> METROPOLITAN <br /> C 0 U N 0 1 L <br /> Page-12 1 2015 SYSTEM STATEMENT—CENTERVILLE TRANSPORTATION <br />