My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-16 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2015
>
2015-12-16 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2015 9:09:30 AM
Creation date
12/16/2015 9:03:51 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Maintenance and Rehabilitation Costs <br /> Cost/Lineal Foot <br /> Pavement Rehabilitatiob, Option <br /> t <br /> AW <br /> Cr ck $44 'a <br /> $11.007 <br /> 2. Bituminous Patching A, <br /> 777 <br /> 60 <br /> 3a. ,0V"'e" ftaYJA w- ta,,'S <br /> $44.00 <br /> 3b. Edge Mill and Overlay (Urban Street) <br /> 4 <br /> jiRe M,zi <br /> w, ye <br /> -p�16 <br /> 46 <br /> 15. Full Depth Reclamation $320.00 <br /> 20 miles of new construction today at $320/1-f. <br /> $33,792,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.