My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-27 CC Packet - **REPLACEMENT**
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2016
>
2016-01-27 CC Packet - **REPLACEMENT**
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:38:31 PM
Creation date
1/25/2016 4:36:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plumbing Permits.....................................................See Exhibit"C" <br /> Electrical Permit Fees..............................................See Exhibit"D" <br /> Demolition Permit& Escrow: <br /> Residential (not required for accessory Bldgs. <120 sq. $.).$200.00(§150.01) <br /> Escrow...........................................................................$2,000.00 or Letter of Credit <br /> Commercial/Industrial..................Valuation Based w/Minimum <br /> Of.................................................................................... $300.00 <br /> Escrow..................................................................................20%of Demo. Cost <br /> Permit Surcharge..................................................... Per State of MN <br /> Chapter 152 <br /> Sign Permit Fee: <br /> Wall-mounted sign.................................................................$75.00 <br /> Free-standing sign(In addition to building permit)...............$75.00 <br /> Chapter 153 <br /> Park Dedication Fees <br /> Land Dedication...........................................................(§153.15) <br /> At option of City-10%of Fair market Value of all property located in the proposed <br /> development or$3,000/unit(whichever is greater) <br /> Commercial/Industrial................................................$2,175.00/acre <br /> Lot Split/Lot Combination...................................................$200.00 plus legal fees+park fees <br /> Park fees only apply if the lot is split <br /> Preliminary Plat Fee—Application............................ $500.00+deposit of$100.00/Lot or Unit <br /> (City Review will cease if costs exceed fees and deposit is not replenished) <br /> Chapter 155-same as Chapter 156 procedure fees <br /> Chapter 156 <br /> Bridges/Structures in easement <br /> Encroachment Agreement.....................................................$100.00 (§154.132) <br /> Annual Insurance Monitoring& Inspection...........................$25.00 <br /> FencePermit................................................................................$60.00 <br /> In Easement—Requires Council Action and Encroach. Agr.$100.00+Recording Fees <br /> PUD Application(§156.251)....................................$500.00+deposit of$100.00/Lot or Unit <br /> (City Review will cease if costs exceed deposit and deposit is not replenished) <br /> Variance Application(§156.310)...............................................$250.00+ deposit of$500.00 <br /> (City Review will cease if costs exceed deposit and deposit is not replenished) <br /> Conditional or Interim Use Permit Application(§156.320)......$250.00+deposit of$500.00 <br /> (City Review will cease if costs exceed deposit and deposit is not replenished) <br /> Rezoning Requests (§156.410)..................................................$250.00+deposit of$500.00 <br /> Page 4 of 17 <br /> 63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.