My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-03-12 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2003
>
2003-03-12 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2006 2:57:48 PM
Creation date
4/25/2006 8:36:22 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />March 7,2003 <br />Ms. Kim Moore-Sykes, <br /> <br />Dear Kim, <br /> <br />The following is a recap of the informational meeting held on February 27, 2003, the meeting was <br />held at City Hall to discuss water main and street Improvements along streets adjacent to Peltier <br />Preserve. Twenty-one residents attended, representing approximately 16 properties. The details <br />of the project were presented, followed by numerous questions by residents, and answers from <br />the City Engineer, Administrator and Public Works Director. <br /> <br />The Feasibility Report was prepared based on the assumption that new water main would be <br />dlrectlonally drilled along Centerville Road, Peltier Lake Drive, Clearwater Drive and Mill Road. <br />Several other options were discussed and are listed below; <br /> <br />Option 1: Feasibility Report. Dlrectlonally drill all mains and services outside the plat. No street <br />reconstruction. Approx. assessment: $5,100. <br /> <br />Option 2: Directional drill main along Peltier Lake Drive from Mill Road to Peltier Circle, with <br />extension north into plat. Water service to adjacent parcels. No street reconstruction. Approx. <br />assessment to 6 lots: to be determined. <br /> <br />Option 3: Directional drill water main and services along Mill Road and Peltier Lake Drive (Mill <br />Road to Peltier Circle). No street reconstruction. Approx. assessment to adjacent properties: to <br />be determined. <br /> <br />Option 4: Open cut all water mains and services within the streets, reconstruct streets. Approx. <br />assessment: $12,000. <br /> <br />At a minimum Option 3 will need to be constructed to extend water to the Peltier Preserve <br />Development. <br /> <br />Please call me at 651-604-4808 with any questions or concerns. <br /> <br />Thanks, <br /> <br />Dan S. Schluender <br />Bonestroo Rosene Anderlik <br />
The URL can be used to link to this page
Your browser does not support the video tag.