Laserfiche WebLink
<br />.. <br /> <br />EXHIBIT B <br /> <br />GRADING PERMIT FEES <br /> <br />GRADING FEES <br /> <br />General. Fees shall be assessed in accordance with the provisions of this section or <br />shall be asset forth in the fee schedule adopted by the jurisdiction. <br /> <br />Plan Review Fees. When a plan or other data are required to be submitted, a plan <br />review fee shall be paid at the time of submitting plans and specifications for review. <br />Said plan review fee shall be set forth in Table A33-A. Separate plan review fees shall <br />apply to retaining walls or major drainage structures as required elsewhere in this code. <br />For excavation and fill on the same site the fee shall be based on the volume of <br />excavation or fill, whichever is greater. <br /> <br />Grading Permit Fees. A fee for each grading permit shall be paid to the Building Official <br />as set forth in Table A33-B. Separate permits and fees shall apply to retaining walls or <br />major drainage structures as required elsewhere in'this code. There shall be no separate <br />charge for ~dard terrace drains and similar facilities. <br /> <br />TABLE A33-A GRADING PLAN REVIEW FEES <br /> <br />50 cubic yards (38.2 m.3) or less .....~..............................................................No Fee <br />51 to 100 cubic yards (40 m3 to 76.5 m.3) .....................................................$35.25 <br />101 to 1,000 cubic yards (77.2 m.3 to 764.6 m3) ..........................................$55.50 <br />1,001 to 10,000 cubic yards (765.3 m.3 to 7645.5 m.3) ..................................$73.88 <br />10,001 to 100,000 cubic yards (7646.3 to 7645.5 m.3) - $73.88 for the first <br />10,000 cubic yards (7645.5 m.3), plus $36.75 for each additional <br />10,000 cubic yards (7645.5 m.3) or fraction thereof. <br />100,001 to 200,000 cubic yards (7645.6 m.3 to 15,291.1 m.3) - $404.63 for the <br />:first 100,000 cubic yards (7645.5 m.3), plus $19.88 for each additional <br />10,000 cubic yards (7645.5 m.3) or :fraction, thereof. <br />200,001 cubic yards (15,291.2 m3) or more - $603.38 for the first $200,000 cubic <br />yards (15,291.1 m.3), plus $10.88 for each additional 10,000 cubic years <br />(7645.5 m.3) or fraction thereof. <br /> <br />Other Fees: <br /> <br />Additional plan review required by changes, additions or revisions to approved plans <br />(minimum charge - one-half hour) ................................................................$75.75 per <br />hour* <br /> <br />*01' the total hourly cost to the jurisdiction, whichever is the greatest. This cost s,ha1l <br />include supervision, overhead, equipment, hourly wages and fringe benefits of the <br />employees involved. <br />