Laserfiche WebLink
March 15, 2016 <br />Paul Palzer <br />Page 2 of 3 <br />Reference: City of Centerville Water Supply Plan <br />Potential tasks beyond the scope of this proposal: <br />1. Recently, the DNR has been re-examining what if traditionally accepted for water level <br />monitoring plans. We are hopeful that the DNR will accept the City's current water level <br />monitoring plan (for Appendix 2). If this is not sufficient to meet DNR requirements, <br />developing a new groundwater monitoring plan would be beyond the scope of this proposal. <br />2. While our proposal includes assisting the City with general water system planning through <br />2040, to complete Table 12 of the Plan, a highly detailed Capital Improvement Plan that <br />extends through 2040 is beyond the scope of this proposal. <br />Stantec can expand this task list to assist the City with additional tasks if requested. <br />DATA NEEDS <br />To complete the Water Supply Plan, a large number of the required tables in the Plan are strictly <br />data entry that will need to be completed by City staff. City staff will need to complete the data <br />in the template word document. The attached Water Supply Plan template is highlighted to <br />identify the follow City responsibilities: <br />1. Tables highlighted yellow identify data entry to be completed by the City. (For example, <br />Table 2 - Historic Water Demand) <br />2. Tables highlighted green are tables which Stantec will start and provide to the City to review, <br />update, and complete. (e.g. Table 6 - Water Sources) <br />3. Tables highlighted magenta are tables where Stantec can provide suggestions or examples <br />for the City to consider, but the City will need to review and determine their preferred <br />choices. (e.g. Table 18 - Water Use Priorities) <br />Design with community in mind <br />33 <br />