Laserfiche WebLink
<br />Centerville Road 10 lots <br />Peltier Lake Drive 18 <br />Peltier Circle 1 <br />Mill Road 10 <br />Clearwater Drive -2 <br />Total Lots 45 <br /> <br />The proposed eight-inch diameter water lines along Centerville Road, Peltier Lake Drive, and <br />Mill Road are considered "trunk" distribution mains. The additional cost for the larger pipe (8" <br />vs. 6") should be funded through the City's trunk water main fund. <br /> <br />Item illY Unit Unit Price Total Price <br />8" vs. 6" water main 2,200 LF $2.50 $5,500 <br />8" vs. 6" gate valve 4 EA $150.00 $600 <br />8" vs. 6" fittings 750 LB $1.50 $1,125 <br />8" vs. 6" joint restraint 50 EA $10.00 $500 <br /> Subtotal $7,725 <br /> 5% Contingency $385 <br /> Total Construction $8,110 <br /> 30% Indirect Costs $2,435 <br /> Total Trunk Water Main $10,545 <br /> <br />Assessment Calculation <br />The developer of Peltier Preserve is responsible for all improvements with the plat. In addition, <br />costs for extending water main to the site and street improvements on Peltier Circle to the north <br />line of Peltier Lake Drive are included. This total cost is shown in the Project Costs section. <br />There are 19 buildable lots in the new subdivision, since one is the existing home of the <br />Buckbee's. <br /> <br />Peltier Preserve Asses'Sment: <br />Outside Plat Assessment: <br /> <br />$579,287/19 = $30,489 per lot <br />$238,295/45 = $5,295 per lot <br /> <br />7 <br />