My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res. #16-030 - Receiving Report, Calling for P.H. 2017 Mill & Overlay
Centerville
>
City Council
>
Resolutions
>
2000-2023
>
2016
>
Res. #16-030 - Receiving Report, Calling for P.H. 2017 Mill & Overlay
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2017 7:44:23 AM
Creation date
11/29/2016 2:32:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Costs <br />• 0 • <br />The cost estimate includes items discussed in the Proposed Improvements section of this report and <br />is based on the Project Limits shown in the appendices as Figure t and the Milling Profile shown on <br />Figure 2. This cost estimate is based on bid prices from the last two years' actual bid costs. <br />Other construction costs outside the main project bid include materials and labor costs for <br />improvements the public works department may make to the roads ahead of the project, such as <br />minor curb replacements, bituminous patching, catch basin repair or storm sewer crossing repairs. <br />In addition to construction costs, other costs which affect the overall project costs include <br />engineering feasibility, design and construction administration costs. These costs are included in the <br />total project costs presented below. <br />PROJECT COSTS <br />Total project costs are the total of both construction and soft costs and are summarized below: <br />*Length includes equivalent tootoges to account for cul--de-sacs <br />City or Centerville Page 4 <br />2017 Thin Overlay Program 193803766 <br />Estimated <br />Location <br />Approximate <br />Project Costs <br />Estimated Total <br />Length [LF] <br />Per Lineal <br />Project Costs <br />Foot <br />I " Overlays <br />Gateway Circle <br />610 <br />$29 <br />$17,815 <br />Mound Court <br />477' <br />$2.9 <br />$13,840 <br />Mound TrafV <br />4„'138* <br />$29 <br />$1241,01 <br />(Beaver Pond way <br />918* <br />$29 <br />$26,6'10 <br />'IPrall ovedays <br />com Creep Park <br />1,065 <br />$13.60 <br />$t4,570 <br />(Eagle (Pass, EagleTr -to IRri an ter <br />350 <br />$13.60 <br />$4,770 <br />(Between Hunter's1st and 2nd <br />1,050 <br />$13,60 <br />$14,320 <br />W side of IHu.ter°s is° <br />230 <br />$13,60 <br />$3,110 <br />W side of Il.,aMotte (Park <br />990 <br />$1160 <br />$i3,4341 <br />F -w in middle of LaMotte Parch <br />535 <br />$13.60 <br />$7,980 <br />(Man Way to Robin Lane275 <br />$13.60 <br />$3,780 <br />Pheasant!'harsh 2nd. NWorDupre <br />1,425 <br />$13.60 <br />$i9„4i41 <br />Estimated Total <br />Prosect Cost <br />$2.69,700 <br />*Length includes equivalent tootoges to account for cul--de-sacs <br />City or Centerville Page 4 <br />2017 Thin Overlay Program 193803766 <br />
The URL can be used to link to this page
Your browser does not support the video tag.