My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-12-06 P & Z Packet
Centerville
>
Planning & Zoning
>
Minutes
>
2000-2022
>
2016
>
2016-12-06 P & Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2019 9:49:28 AM
Creation date
12/2/2016 9:26:51 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Motion by (",o2Mminniisnsiio2nneg!!Lpgyin tMg&ded b Commissioner Sloe <br />y <br />Chairperson Hanson closed the public hearing at 7:50 p.m. <br />III. APPEARANCES <br />None. <br />I. OLD BUSINESS <br />None. <br />V. NEW BUSINESS <br />I , Joyce A. Stevens — Rezone from R2 to 11 Request 7007 — 2& Avenue <br />Commissioner Kilian stated he did not feel a rezone to Industrial would be appropriate <br />due to the fact the property is surrounded by residential property. <br />Commissioner McLean stated it was discussed earlier that the business owner could <br />continue to operate without rezoning to Industrial. This may affect the sale but perhaps <br />something could be worked out between buyer and seller. <br />Chairperson Hanson expressed concern that the City use caution to avoid spot zoning. <br />The current use ;of the property works within the residential neighborhood but a rezone to <br />industrial could bring another type of use, <br />the reguesLed rnezon in favor., Motioln carTied unanimgMLIL <br />S_ _ <br />2, Lloyd Drilling — Site Plan <br />Chairperson Hanson questioned whether there would be grass or asphalt behind the <br />building in the northwest comer. Mr. Drilling indicated there may be overflow parking <br />and grass it has not yet been decided. <br />Commissioner Kilian expressed concern for the location of the dumpsters as that was a <br />concern raised by residents at the public hearing. Mr. Drilling indicated the exact <br />location has not been determined and he is open to City input. <br />Commissioner Sheppard questioned the length of the current strip mall comparative to <br />the proposed strip mall, Mr. Drilling indicated the current strip mall is 220 feet long, and <br />55 feet wide and the: proposed strip, mall is 250 feet long and 40 feet wide. <br />Commissioner Kilian questioned the type of exterior building materials. Mr. Drilling <br />indicated the building would be brick and/or cut block and siding. The building is quite <br />long and he is attempting to make it more appealing. <br />Page 8 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.