Laserfiche WebLink
November 9, 2016 <br />Mike Ericson <br />Page 2 of 3 <br />Prepare ALTA/ACSM survey drawing using the Minimum Standard Detail Requirement <br />(attached) and include items 1, 2, 3, 4, 6a, 8, 9, 11, and 13. Note that we would expect <br />the city clerk to provide the report described in No. 6a. <br />Lump Sum price of $2,900.00. <br />SCHEDULE <br />We could begin work on the survey within two weeks of authorization and could finish within two <br />weeks of receiving all necessary information, including valid title commitments. <br />With either option, the city would own the end -product survey and could sell (or be reimbursed) <br />for it, by an eventual buyer. Often, these documents are needed to secure financing for a <br />project. If services beyond those discussed in this scope of work become necessary, we will <br />present this information and request authorization for the additional compensation, as <br />appropriate. <br />Regards, <br />Stantec Consulting Services, Inc. <br />Mark Statz, PE <br />City Engineer <br />Phone: 651-604-4709 <br />mark.statz@stantec.com <br />Attachments: Project Area (Figure 1), ALTA/ASCM Survey Standards <br />c. Jonathan Simmons, Dan Roeber, Lee Mann - Stantec <br />Paul Palzer- Public Works Director <br />sm dxumenV <br />Design iy lh cummA drily �, rr�hd <br />