My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-08 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2017
>
2017-03-08 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2017 1:30:30 PM
Creation date
3/3/2017 11:57:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L154 What did inspectors reeelve? Check all that apply. <br />X University, of M6mesots Erosion and Stormwater Management Certification Program <br />Qualified Compliance Inspector of Stormwater (QW) <br />Minnesota Laborers Training Center Stomrwater PoSufion Prew ration Plan Installer or Supervisor <br />Minnesota Utility Contractors Assocatlon Erosion Control Training <br />Certified Professional M Erosion and Sediment Control (CPESC) <br />Certified Professional in Rormwater Quality (CPSWQ) <br />Certified Erosion Sediment and Storm Water Inspector (CESSWI) <br />describe: I I <br />QSS Between January 1, 2016 and December 31, 2016, did you modify your BMPs, measurable goals, or future plans for your con ttrudbn site stormwater runoff control <br />program? [Part N.B.) <br />Lill <br />Minnesota Pollution <br />Control Agency <br />MCM 5: Post -Construction Stormwater Management <br />The folbwing questions refer to Part III.D.S. of the Permit <br />Q% Do have a regulatory mechanism which meets all requirements as spedfled in Part NLDS.a of the Permit? <br />Yes <br />Q57 What approach are you uslnto meet the performance standard for Volume, Total Suspaded Solids (TSS), and Total Phosphorus (TP) as required <br />by the Permit? (Part III.D.W 41 Check all that apply. <br />a runoff volume, equal to one Inch times the ares of the proposed increase of Impervious surface ori -site <br />the post -construction runoff volume on site for the 95th percentile storm <br />the predevetopmem runoff conditions <br />the Minimal Impact Design Standards (MIDS) <br />roach has not been selected <br />QSS Do you have written Enforcement Response Procedures (ERPs) to compel compliance with your post -construction stormwatermanagement regulatory <br />machankin(s)? (Part IILILI <br />Yes <br />Q59 Between January 1, 2016 and December 31, 2016, did you modify your BMP%, measurable Soak, or future pians for your post-construdbn site stormwater <br />management program? [Part IV.B.J <br />wl,1 Minnesota Pollution <br />Control Agency <br />MCM 6: Pollution Prevention/Good Housekeeping for Municipal Operations <br />The following questions refer to Part fit.0.6. of the Penr& <br />Q60 Enter the total number of structural stormwater BMPs outfalls (axduding underground outfalls), and ponds within your MS4 (exclude privately owned). <br />Structural stomnvoterSMPs 1 <br />040s 33 <br />Ponds 1 95 <br />Q61 Enter the number of structural stormwater BMPs, outfalls (excluding underground outfalls), and ponds that were Inspected from January 1, 2016 <br />to December 31, 2016 within your MS4 (exclude privately owned). (Part III.D.6.e.) <br />StructuralstormwsterBMPs 1 <br />Outfalls 30 <br />Ponds 33 <br />Q62 Have you developed an ahemative inspection frequency for any structural stormwater BMP%, as allowed In Part IILD.6.e.(1) of the Permit? <br />Yes <br />
The URL can be used to link to this page
Your browser does not support the video tag.