Laserfiche WebLink
Q26 ff'Wln= did any of the discovered Ulidt discharges mutt in an enforcement action (this Includes vedal warnings)? <br />0.27 If'Yes' In 0.26, what type of enforcement action(s) was taken and how many of each action were issued between January 1, 2016 and December 31, 20167 <br />Check all that apply. <br />�Verbelwmnkhg <br />rr�Nr----umbe��rr bsue��d: <br />Noticeof vkhlation <br />da=m: L <br />Q28 If'yas' in Q26, did the enforcement action(s) taken suffidmtly address the illicit discharge(s)? <br />Q29 If'No' in 0,78, why was the enforcement not sufficient to address the illicit dl s ? <br />0130 Do ou have written Enforcement Response Procedures (ERPs) to compel compliance with your Illicit discharge regulatory mechanism(s)? (Part III.B.) <br />Yes <br />Q31 Between January 1, 2016 and December 31, 2016, did you train all field staff in Rgdt discharge recognition (mdudkng comOdora which could cause illicit discharges) <br />mai reporting Illicit discharges for further Investigations? (Part ULD.3x.) <br />res <br />Q32 ff'Yes' ip 431, how did you train your field staff? Check aft that appy. <br />describe: I Information provided by Contracted Engineer <br />The following questions refer to Part gi.C1. of the Permit <br />Q33 Did = uEdide your storm sewer system map between January 1, 2016 and December 31, 20167 (Part III.CL) <br />No <br />434 Does r storm sewer map include all pipes 12 inches or greater In diameter and the direction of stormwater flow In those pipes? (Part III.Cl.a.] <br />Yes <br />01" Does VOW storm sewer map include outfalls, including a unique hknURcatton (10) number and an associated geographic coordinate? (Part III.Cl.b.] <br />Yes <br />436 Does your storm sma er map include all structural stonnwater BMPs that are part of your MSR [Part IR.CS.tj <br />Yes <br />497Doas storm sewer map Include all receiving waters? (Part ULCIA] <br />Yes <br />an In what format is your storm sewer map available? <br />describe: <br />039 Between January 1, 2016 and December 31, 2016, dM you modify your BMPs, measurable goals, or future pians for your Bildt discharge detection and elimination (IDDE) program? <br />(Part N a.) <br />LI <br />LMinnesota Pollution <br />Control Agency <br />MCM 4: Construction Site Stormwater Runoff Control <br />The following questions refer to Part IILD.4. of the Permit. <br />040 Do you have a regulatory mechanism that is at least as stringent as the Agency's general Permit to Discharge Stormwater Associated with <br />Construction Activity (CSW Permit) No. MN R1o00D1(htt V/www.pca.state.mmusAndex.php/viewrdocumem_htmi?gid=18984) for <br />erosion and sediment controls and waste controls? [Part III.D.4.8] <br />res <br />`A <br />