My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-04-04 P & Z Packet
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2022
>
2017
>
2017-04-04 P & Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2017 2:50:10 PM
Creation date
3/31/2017 3:08:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
conditional use. Such report shall be accompanied by findings of fact specifying the reasons for <br />the recommendation. In considering conditional use applications in the Flood Plain Districts, the <br />Planning Commission shall consider all requirements of this Chapter together with Chapter 155, <br />Flood Damage Prevention. <br />(4) The Council shall, within 30 days of the receipt of the report of the Planning Commission, grant <br />or deny the conditional use or refer the matter back to the Planning Commission for further <br />consideration. The Council shall not grant a conditional use unless it finds that the standards of <br />this Section have been satisfied. Any proposed conditional use which fails to receive the <br />approval of the majority of the members of the Planning Commission voting upon it shall not be <br />approved except by a favorable vote of four-fifths of all of the elected members of the Council. <br />(5) A Conditional Use Permit shall be valid for a period of one year from the date of its approval by <br />the Council, after which the same shall be revoked in the event that any proposed construction, <br />alteration or operation has not been started in accordance with the terms of such permit. <br />(6) A Conditional Use Permit shall remain in effect only so long as all of the conditions granted by <br />the Council are observed. The Permit is immediately void when a condition is no longer <br />observed and may only be renewed after a new application for a Conditional Use Permit has <br />been granted as set forth in this section. The Permit shall run with the land so long as the <br />conditions are observed. Failure of the City to discover the violation of a condition, or failure by <br />the City to act upon a violation of a condition does not constitute a renewal of the Conditional <br />Use Permit or a waiver of the City's right to take enforcement action. <br />§§ 156.321 THROUGH 156.329 RESERVED FOR FUTURE USE. <br />§ 156.330 INTERIM USE PERMITS. <br />(A)Purpose. It is intended that the interim use permit procedures allow flexibility in the use of land or <br />structures in the city, when the uses are not permanent and when the uses meet appropriate conditions <br />and performance standards that protect the public health, safety and welfare. <br />(B)Authority. The Council may, after review, hearing and report by the Planning Commission, grant a <br />Interim Use Permit authorizing the development of a interim use upon a showing by the applicant that <br />the standards, criteria and purpose of the district in which the proposed use is to be located, will be <br />satisfied. The standards and criteria shall include both general requirements for all conditional uses and, <br />insofar as practicable, requirements specific to each designated interim use. <br />(C) Standards and conditions for interim uses. <br />(1) A Interim Use Permit may be granted for the following uses only: <br />382 1 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.