My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-04-04 P & Z Handouts
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2022
>
2017
>
2017-04-04 P & Z Handouts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2017 2:47:33 PM
Creation date
4/5/2017 8:17:55 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(A) A final plan of the PUD in schematic form including the following: <br />(1) The street system, lot layout and off-street parking and loading plan; <br />(2) The use, height, bulk and approximate location of buildings and other structures; <br />(3) Land areas to be conveyed, dedicated or reserved for parks, parkways, playgrounds, school sites, <br />public buildings and similar public and semi-public uses; <br />(4) A site plan for each building site and common open area, showing approximate location of <br />buildings, structures and improvements; <br />(5) Generalized elevations and perspectives of all structures; <br />(6) A site grading plan indicating the direction of flow of surface drainage and all easements <br />necessary for both ponding and runoff; <br />(7) Plans, profiles and specifications for the distribution of water, collection of sanitary waste and <br />stormwater; <br />(8) A landscape plan indicating the location, size and type of plant materials to be used; <br />(9) Plans, profiles, typical sections and specifications for proposed street improvements; and <br />(10) The density of land use to be allocated to the several parts of the site being developed. <br />(B) A written statement including: <br />(1) The approximate date when construction will begin by stage of development and the area of <br />open space to be provided at each stage; <br />(2) Agreements, provisions or covenants which govern the use, maintenance and continued <br />protection of the development and any of its common open areas; and <br />(3) Other conditions specifically required by the Commission and the Council for the particular <br />PUD. <br />§ 156.256 ACTION ON FINAL APPLICATION. <br />(A) Procedure for action by the Planning and Zoning Commission and the Council on an application for <br />review and approval of the final plan for a PUD shall be the same as prescribed by this subchapter for <br />the action on the preliminary proposal. In giving approval, the Council may specify the length of time <br />within which construction of the project must be begun or completed, and it may attach other conditions <br />375 1 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.