Laserfiche WebLink
Estimated Costs and Quantities <br />Revise Signal System (FYA Modifications) <br />CSAH 14 at CSAH 54 <br />Prepared by JMG (SEH) on October 12, 2015 <br />Item <br />Estimated Estimated Estimated <br />Quantity Unit Cost Total Cost <br />Remove 3 -Section Signals <br />8 <br />$300 <br />$2,400 <br />4 -Section Signals (with LED) <br />9 <br />$800 <br />$7,200 <br />5 -Foot Extension <br />1 <br />$1,500 <br />$1,500 <br />Mid -Mast Arm Mount (for SB traffic) <br />1 <br />$1,000 <br />$1,000 <br />R10 -X12 Sign Panels <br />4 <br />$500 <br />$2,000 <br />Controller Cabinet Modifications <br />1 <br />$1,000 <br />$1,000 <br />6 x 6 NMC Loop Detectors <br />5 <br />$1,200 <br />$6,000 <br />6/c#14 Cable (to poles 2, 3, 4) <br />800, <br />$2 <br />$1,600 <br />2/c#14 Cable (to left turn loops) <br />1000, <br />$1 <br />$1,000 <br />Traffic Control <br />1 <br />$1,000 <br />$1,000 <br />Sub Total <br />$24,700 <br />Miscellaneous <br />15% <br />$3,800 <br />Total Estimated Revise Signal System Costs <br />Optional Conflict Monitor Upgrade <br />128 <br />$28,500 <br />$1,200 <br />