Laserfiche WebLink
City of Plymouth 2017 MWC Determination <br />Plymouth Cost Allocation Year Metered Flow: 2,235.20 million gallons (MG). <br />Plymouth Cost Allocation Year Unmetered Flow: 43.36 MG. Depending on the total <br />generation rate per connection count (where applicable) can very between 60,000 <br />4 <br />on historical community responses to wet weather, age of services and other ava <br />in 2015 was 36.14 inches, which was above the 30 -year average of 30.61 inches. T <br />below. <br />precipitation, the assigned wastewater <br />00,000 gallons/year/REC. This rate is based <br />data. The total "water equivalent precipitation" <br />Lesuafin assigned the generation rates <br />City Flowin7To <br />Calculation <br />w (MG) <br />Note b: Source <br />Wayzata <br />30 REC x 100,000 gpy ", <br />-r <br />3• <br />(75 REC x 100,000 gpy) + 10,230,000 comm{ <br />90,00 I <br />19'1 <br />and institutional umes <br />Minnetonka <br />inst. <br />are based oln ester use records <br />submitted by the City of Plymouth <br />Maple Grove <br />217 REC x 100,000 gpy <br />21.70 <br />TOTAL ADDS <br />43.82 <br />City Flowing From <br />Calculation aw' <br />Flow (MG) <br />Notes Re: Source <br />Minnetonka <br />1 REC x 80,000 gpy x'?.'' <br />t <br />-0.08 <br />Medicine lake <br />(2 SFU + 1 Comm.) x 100,0001 t ' <br />3 REC x 10r7;0�Or /365 x 1 'OF . eken <br />-0.38 <br />3 REC @100 days for catering hall <br />TOTAL DEDUO'(`S'',''�*, t <br />-0.46 <br />Y: <` Total: 43.36 <br />4 �{ <br />For the 2017 Cost Allocaf ii Year, the totgi:re�d 1 flo ,> s 85.298.36 MG. <br />The 2017 Metropolitan Wgite Ater-Ghar.,ge toy allocated was $211.941.538. <br />The City's 2017 Flow Allocation was 2,271856 IN' which represents 2.671282% of the total regional flow. Therefore, the City's 2017 <br />Annual Charge was $5,661.556.81, or 2.674282% of $211,941,538. <br />The City's 2017 Annual Charge reprei` a 7.26% increase from the 2016 Annual Charge. It should be noted that this percentage <br />incorporates an overall budget increase of 5.4%. <br />