My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-06-06 P & Z Packet
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2022
>
2017
>
2017-06-06 P & Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2018 9:59:00 AM
Creation date
6/1/2017 3:05:47 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.3 Staff Coordination/Project Management 2 3 I <br />TASK TOTAL $ 1,440 $ 2,808 $ 1,233 $ 3,570 $ 555 $ 735 $ $ 10,341 <br />3.1 Research <br />3.1.a Create Transportation Analysis zone table: allocate forcasted population and <br />employment <br />3 <br />2 <br />3.1.b Assess road need and suitability for bicycle features <br />1 2 <br />—r - <br />2 <br />i <br />3.1.c *for communities Impacted by an airport assess noise impacts and land use { <br />.compatibility <br />3.S.d'For communities with planned 2040 bus or LRT improvements, guide land use to <br />support transit usage <br />3.2 Mapping <br />3.2.a Map functional classification <br />3.2.b Map current traffic volumes --------__.__ <br />3.2.c Map bike routes/trails existing and planned as well as regional bike network (how <br />6 <br />2 <br />I <br />_ <br />4 _ <br />connections work in local community) <br />I 2 <br />3.2.d Map railways and rail yards —_ <br />0 <br />I <br />3.2.e Map airports <br />3.2.f Map transit existing and planned <br />0 <br />0 <br />j <br />3.2.g Map truckvoium_es (for freight routes) <br />—~� <br />2 <br />2 <br />3.2.h Map projected 2040 AADT <br />2 <br />2 <br />3.3 Writing <br />3.3.a Describe relationship of transportation system to guided growth <br />1 <br />2 <br />3.3.b Describe functional classification <br />2 <br />1 <br />3.3c Identify existing and future number of lanes I <br />0 <br />3.3.d Describe recommendations from recent corridor studies <br />2 <br />3.3e Incorporate MnDOT access management guidelines <br />1 <br />2 <br />3.3.f Identify transit routes, park and ride stations, transit stations or centers (existing and <br />future)----- <br />uture)---3.3.g <br />3.3.gIdentify future right of way that needs to be a uired ; <br />__.. - -__ ..—_ _.cam—_, - <br />2 2 <br />3.3.h Describe existing and planned bicycling facilities <br />1 <br />1 <br />3.3.i Analyze and address the need for ped/bike facilities that remove major physical + <br />I <br />i <br />barriers <br />1 <br />3.3.j Address pedestrian system needs <br />1 <br />3.3.k Identity policies to protect regional airspace from obstructions <br />3.3.1 Identify nodes that may generate freight movement; e.g. industrial parks and shopping <br />areas <br />1 <br />1 <br />3.3.m Develop transportation specific goals and policies <br />2 <br />2 <br />3.3.n Formatting document <br />4 <br />3.4 Staff Coordination/Project Management <br />2 3 <br />5 <br />960 $ 2,106 $ 822 $ <br />1,890 $ <br />444 $ 2,793 $ $ 9,015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.