My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-06-06 P & Z Packet
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2022
>
2017
>
2017-06-06 P & Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2018 9:59:00 AM
Creation date
6/1/2017 3:05:47 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />April 26, 2017 <br />Mike Ericson <br />Page 6 of 7 <br />Reference: CMy of Centerville Local Wafer Plan <br />commence data collection and model updating. Stantec anticipates providing the completed, <br />draft surface water plan for city review within six months of the authorization to proceed. We <br />would be happy to adjust our schedule to meet the needs of the City. The team providing <br />services will include Dan Edgerton as project manager and Tyler Johnson as lead engineer, with <br />others supporting as needed. <br />Stantec will provide services on an hourly basis and estimates the level of effort required to be <br />$24,000 in accordance with the above work plan. Reimbursable expenses are included in this <br />proposed figure. Stantec will not exceed the hourly amount without further authorization from <br />you. <br />This letter represents the understanding between the City and Stantec in respect to the Project <br />and may only be modified in writing signed by both of us and is subject to the current Master <br />Services Agreement between the City of Centerville and Stantec. <br />Design with community in mind <br />
The URL can be used to link to this page
Your browser does not support the video tag.