My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mandatory Municipal Water Connection Deadline Date of December 31, 2017
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2017
>
Mandatory Municipal Water Connection Deadline Date of December 31, 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2017 7:08:24 PM
Creation date
6/14/2017 5:58:50 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance Amendments <br />Current Ordinance states "All property served by private water <br />systems must connect to public water, if it is available, no later <br />than 12-31-201'7, except that where water is made available by the <br />City after Januaryl,2013, properties served shall be connected no <br />later than 12-31-2021. <br />In 2013 the fee associated with well repair was increase from $500 <br />to $1,000. <br />City Code from 1987 states "At such time as municipal water <br />becomes available to existing homes or buildings, a direct <br />connection shall be made to such public system within a period <br />of time as determined by the City Council. If such connection is <br />not made pursuant to this ordinance, a penalty shall be levied in <br />an amount set by City Council Resolution. <br />
The URL can be used to link to this page
Your browser does not support the video tag.