Laserfiche WebLink
§ 153.40 PRIOR IMPROVEMENTS. <br />Improvements which have been completed prior to application for final plat approval or execution of the <br />developer's agreement shall be accepted as equivalent improvements, provided the City Engineer shall certify <br />in writing that the improvements conform to the city standards. <br />§ 153.41 AS -BUILT PLANS. <br />Upon completion of installation of all required improvements, the subdivider shall file with the <br />Administrator a reproducible tracing and two copies of the plans and specifications showing all improvements <br />as finally constructed and installed. An electronic/digital version of the required filing shall also be submitted <br />in a format acceptable to the city. All as -built plans will be prepared by City Engineer and the time billed to the <br />developer. <br />§ 153.42 IMPROVEMENT CONSTRUCTION. <br />All required improvements specified in this subchapter shall be constructed in accordance with the city <br />standards and all other applicable city, county and state regulations. <br />§ 153.43 DEVELOPMENT IMPROVEMENTS; SITE GRADING. <br />(A) Grading. <br />(1) The developer shall do all site grading including the front 100 feet of the lots, common green <br />way and open spaces, stormwater storage ponds and surface drainageways, including sodding of <br />boulevards all in accordance with the approved grading, drainage and site plan. A grading plan <br />with maximum 2 -foot contours and cross-sections as necessary shall be submitted and approved <br />by the city prior to commencement of any site grading. <br />(2) Boulevards shall be graded at an incline of two percent behind the curb. The sidewalk <br />construction shall be in accordance with the city -approved streetscape and shall reflect a <br />consistent grade that follows the back of the curb. <br />(3) (a) After substantial building completion and prior to the issuance of an occupancy <br />permit, a certificate of survey shall be provided to the city verifying that the lot <br />grading has been accomplished to the approved standards. <br />(b) The certificate of survey will locate the following: <br />1. Property irons; <br />2. Buildings; <br />3. Driveways; <br />278 1 Page <br />