My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-23 Set Agenda
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2017
>
2017-08-23 Set Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2017 12:51:07 AM
Creation date
8/23/2017 5:35:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />UTILITY FFES, CHARGES AND OTHER COSTS <br />Sewer Availability Charge (SAC) (City) (Per Residential Equivalent Unit) <br />..................................................................................................................... $2,300.00 (§51.07) <br />Sewer Availability Charge (SAC) (MCES) (Per Residential Equivalent Unit) <br />..................................................................................................................... $2,485.00 (§51.07) <br />Water Availability Charge (WAC) (PerResidential Equivalent Unit)......... $1,850.00 (§51.07) <br />Water Lateral Benefit Fee (Unassessed properties) .................................... $6,500.00 <br />Sanitary Sewer Lateral Benefit Fee (Unassessed properties) ...................... $8,100.00 <br />Storm Water Area Charge (Developer's Agreement) .05739 per square foot (§51.11) <br />Commercial/Industrial.......................................................................................... $.07 per square foot of building, <br />parking and other impervious surfaces <br />ErosionControl Site Fee...................................................................................$360/Unit <br />Water/Sewer Permit Fees (01.07) <br />Service/Connection (Includes 2 inspection trips to site ..................... $75.00 <br />TappingMain..................................................................................... $50.00 <br />Curb Stop Activation.........................................................$75.00 <br />Inspections (All)/each........................................................................ $40.00 <br />Service Charges - Meters <br />Testing.............................................................................................. Cost <br />Water Meter Charee (01.05. H <br />3/4" Meter........................................................................................ $411.00 <br />1" Meter...........................................................................................$527.00 <br />MinorRepairs...........................................................................Cost + 20% <br />Special and other sizes .............................................. Cost plus Handling <br />(These Rates are Subject to Tax) <br />WaterTest Fee................................................................................................... $6.36 (7/1/06) <br />Water Usage Rates 051.02) <br />Residential <br />Water System Management Fee/Bi-Monthly Billing Period ............. $14.47 <br />Variable — Rate Per Thousand Gallons/Qtr. (0-90,000) ....................... $2.16 <br />Variable — Rate Per Thousand Gallons/Qtr. (90,001-150,000) ............ $2.38 <br />Variable —Rate Per Thousand Gallons/Qtr. (150,001 -XXX) .............. $2.71 <br />Commercial <br />Water System Management Fee/Bi-Monthly Billing Period ............. $14.85 <br />Variable — Rate Per Thousand Gallons/Qtr. (0-500,000) ..................... $2.16 <br />Variable — Rate Per Thousand Gallons/Qtr. (500,001 -XXX) .............. $2.71 <br />Sewer/Wastewater fee (bi-monthly) <br />Sewer Charges will include two components. The first is a flat fee covering the City's fixed and variable costs <br />for sewer collection (Collection Rate). The second fee is to cover the variable charge for wastewater treatment <br />(Treatment Fee). The Treatment charge will be the Treatment Fee rate multiplied times the water meter use for <br />the billing period. To account for summer irrigation water not being treated, the charge for the July and <br />November billings shall not exceed the average use during the first billing period of that year and the final <br />billing period of the prior year (winter average). If the home is unoccupied during a significant part of the <br />Page 7 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.