Laserfiche WebLink
EXHIBIT D <br />ELECTRICAL FEES <br />Individual/separate inspection (installation, replacement, alteration or repair) .......................................... $45.00 <br />Services, generators, feeders to separate structures and other power supply resources: <br />1. 0 ampere to and including 200 ampere capacity ............................................................. $45.00 <br />2. Each additional 100 amps or fraction thereof ................................................... an add'1$10.00 <br />3. For services and circuits operating at over 250 volts .....................(Scheduled fee doubles) <br />Circuits, feeders, feeder taps, or sets of transformer secondary conductors: <br />1. 0 ampere to and including 30 ampere capacity ................................................................. $8.00 <br />2. 31 amps to 100 amps...................................................................................................$10.00 ea. <br />3. Each additional 100 amps................................................................................... an add'1$5.00 <br />One -Family dwelling and each dwelling unit of a two-family dwelling ................................................... $175.00 <br />Up to and including 200 amps service (includes not more than three inspections) <br />Multifamilydwellings............................................................................................................................... $100.00 <br />Each existing circuits or feeders reconnected to replacement panels (new or extended circuits or feeders at the <br />abovefees).......................................................................................................................................... $3.00 <br />Electrical supply for each manufactured home park lot.............................................................................. $45.00 <br />Recreational vehicle site, electrical supply equipment.............................................................................$10.00 ea. <br />Street, parking lot or outdoor area lighting standards................................................................................... $8.00 <br />Transformers for light, heat and power: <br />1. Up to and including 10 kilo -volt amps........................................................................$20.00 ea. <br />2. Over 10 kilo -volt amps................................................................................................$40.00 ea. <br />Transformers and electronic power supplies for electric signs and outline lighting ..................................... $8.00 <br />Swimming pool bonding inspection (each separate inspection).................................................................. $45.00 <br />(Bonding conductors and connections require an inspection before being concealed) <br />Retrofit modifications to existing lighting fixtures............................................................................... $.50/fixture <br />Transient Projects - Power supply fees as identified above, plus 1 hour ............................................... $90.00/hour <br />Each attraction or concession inspection..................................................................................................... $45.00 <br />Special inspection or inspections not covered above the fee is $90.00 per hour plus mileage at the rate <br />established per the IRS. <br />Re -inspection fee when inspection is necessary to determine whether the unsafe conditions have been corrected <br />— a fee will be assessed by the inspector..................................................................................................... $45.00 <br />MinimumFee per Trip................................................................................................................................ $45.00 <br />*Electrical work commenced without filing the required permit, in addition to the permit fee, shall pay two <br />times the permit fee, not to exceed $1,000. *For purposes of interpretation, Minnesota Rules, Chapter 3800, <br />Page 13 of 17 <br />