Laserfiche WebLink
EXHIBIT D <br />ELECTRICAL FEES <br />Individual/separate inspection (installation, replacement, alteration or repair) ............................... 0..4.0.4 ... $45.00 <br />Services, generators, feeders to separate structures and other power supply resources: <br />1. 0 ampere to and including 200 ampere capacity............................................................. $45.00 <br />2. Each additional 100 amps or fraction thereof ................................................... an add' l $10.00 <br />3. For services and circuits operating at over 250 volts .....................(Scheduled fee doubles) <br />Circuits, feeders, feeder taps, or sets of transformer secondary conductors: <br />1. 0 ampere to and including 30 ampere capacity................................................................. $8.00 <br />2. 31 amps to 100 amps................................................................................................... $10.00 ea. <br />3. Each additional 100 amps............................................................ an add'l $5.00 <br />One -Family dwelling and each dwelling unit of a two-family dwelling ................................................... $175.00 <br />Up to and including 200 amps service (includes not more than three inspections) <br />Multifamilydwellings............................................................................................................................... $100.00 <br />Each existing circuits or feeders reconnected to replacement panels (new or extended circuits or feeders at the <br />abovefees)■4..0.00009.....0.0000.....0.0.►00...0..6....4.00......00.0►0.....0..........0.6.0.......6.040........00..•...►.00001►00►.....00..0 0.....0$3.00 <br />Electrical supply for each manufactured home park lot.............................................................................. $45.00 <br />Recreational vehicle site, electrical supply equipment.............................................................................$10.00 ea. <br />Street, parking lot or outdoor area lighting standards................................................................................... $8.00 <br />Transformers for light, heat and power: <br />I . Up to and including 10 kilo -volt amps........................................................................ $20.00 ea. <br />2. over 10 kilo -volt amps........................................................................................ 6 ....... $40.00 ea. <br />Transformers and electronic power supplies for electric signs and outline lighting ..................................... $ 8.00 <br />S g pool bonding inspection (each separate inspection).................................................................. $45.00 <br />(Bonding conductors and connections require an inspection before being concealed) <br />Retrofit modifications to existing lighting fixtures..6....... $.5Olfxture <br />.................................................................... . <br />Transient Projects - Power supply fees as identified above, plus I hour ............................................... $9O.00lhour <br />Each attraction or concession inspection..................................................................................................... $45.00 <br />Special inspection or inspections not covered above the fee is $90.00 per hour plus mileage at the rate <br />established per the IRS. <br />Re -inspection fee when inspection is necessary to determine whether the unsafe conditions have been corrected <br />--- a fee will be assessed by the inspector..................................................................................................... $45.00 <br />MinimumFee per Trip................................................................................................................................ $45.00 <br />*Electrical work commenced without filing the required permit, in addition to the permit fee, shall pay two <br />times the permit fee, not to exceed $1,000. *For purposes of interpretation, Minnesota Rules, Chapter 3800, <br />Page 13 of 17 <br />