My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-11-08 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2017
>
2017-11-08 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2017 10:17:43 AM
Creation date
11/13/2017 10:15:53 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
will be allowed and no building permits will be issued unless the Developer is in full <br /> compliance with the approved erosion control plans. <br /> The Developer shall require all homebuilders working on the project to comply with <br /> City's erosion control standards. The homebuilders are to be educated on the City standards and <br /> the homebuilders may be required to post surety to secure performance. The City will work <br /> cooperatively with the developer in securing homcbuilder compliance with erosion control <br /> standards through the building permit process. <br /> 12. GRADING PLAN. The Plat shall be graded in accordance with the Grading <br /> Plan. Within thirty(30) days after completion of the grading and before the City releases any <br /> Security,the Developer shall provide the City with an"as constructed"grading plan certified by <br /> a registered land surveyor or engineer,with elevation shots showing that all ponds, swales, <br /> emergency overflows and ditches have been constructed in accordance with the approved <br /> grading plan. Developer shall require lot purchasers to verify lot comer elevations and house <br /> pads. The City will withhold issuance of building permits until the approved certified grading <br /> plan is on file with the City and all erosion control measures are in place as determined by the <br /> City Engineer, The Developer shall be required to maintain all erosion control measures until <br /> the project is accepted by the City. <br /> 13. DEWATERING. Due to the variable nature of groundwater levels and <br /> stormwater flows, it will be the Developer's and the Developer's contractors and subcontractors <br /> responsibility to satisfy themselves with regard to the elevation of groundwater in the area and <br /> the level of effort needed to perform dewatering and store flow routing operations. All <br /> dewatering shall be in accordance with all applicable county, state, and federal rules and <br /> regulations. DNR regulations regarding appropriations permits shall also be strictly enforced. <br /> 14. CLEAN UP. The Developer shall daily clean dirt and debris from streets that has <br /> resulted from construction work by the Developer, its contractors, subcontractors, agents or <br /> assigns. Prior to any construction on the Plat,the Developer shall identify in writing a <br /> responsible party for erosion control, street cleaning, and street sweeping. During such times as <br /> VKG-2017-11-03 Page 6 <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.