and fallen trees (see site pictures at end of memorandum). asea on this determination,the lateral
<br /> recession to was estimated to be 0.3 Styr,which is on the low and of the'severe' range(0.3- 0.5
<br /> Styr). Assuming sandy soils, the estimated soil loss from this 350' stretch of bank with an average 2'
<br /> eroding face is approximately 11.6 tons per year. This results in an estimated 9.82 pounds of total
<br /> phosphorus contributed to Centerville Lake and downstream waterbodles,annually. Stabilization of the
<br /> bank will result in 100 percent reductions in these estimated pollutant leads.
<br /> ELIGIBLE EXPENSES AND REQUESTED FUNDING
<br /> The grant request outlined in this section is based on the lowest of six quotes solicited from contractors
<br /> by the City of Centerville. The low bidder salmon, Shoreline Landscaping, is shaded gray. See
<br /> attached cost estimates for additional detail.
<br /> Summary of Quotes Received
<br /> ORIGINAL QUOTE FORM
<br /> Contractor
<br /> Carearromism Mlniiosou Native Outdoor Lab All Season Cold Stone
<br /> Item QUO Held Landscelpe Land the Larrosespe Services,Inc, Shorelines
<br /> Mobilization I Ls 1,ods. 5 2,750-00 1,000,00 400,00 $ 1,000.00
<br /> Traffic control-bituminous walk'ng trail and street 1i
<br /> if applicable 1 1 LS CAOAIA $ 1,500,00 350.00 600 00 850-00
<br /> class III riprap(9"-18"diameter,as stiecified in
<br /> MNDOT 3601)traprock 115 CV 10,3SD,00 $ 18,739.25 17,2500C, $ 21,275.110 2$
<br /> 215 ft wide Tom IV Non-Woven Geatextile fabric
<br /> (Propre:Gewose Sol,or equivalent) 405 LF It 91040 $ 1,773,90 3,240.00 S 4021 0 z
<br /> Site restoraVon 1 1.5 Z,Z% $ 3,80116 it 500.00 $ 2,0011
<br /> Live,dommirlt willow stakes 125 EACH I,DW` $ 1 c
<br /> 74 EACH 740. EMU C 518-isu 4 888.1111 eup.ev
<br /> 540 EACH 1,620VO $ 11,080,00 $ 1,798-20 $ 1,35100 1 i
<br /> 28,87&00 C 29.3pis.00 $, 31,666,35 $63.356.6
<br /> ALTERNATIVES
<br /> '
<br /> anConntractor
<br /> up"'
<br /> Cies
<br /> Dreamwapas Minoes*MNallve Outdoor lob All s aold C $lease
<br /> "'IS
<br /> Itarra
<br /> Quesdifty Urift cr fteogninLandscape tai ndscapes inc Landman. Services,Inc Shorelines 'I
<br /> S' duorr , ecified in
<br /> ass
<br /> „„18,
<br /> sta's{river at. -E
<br /> 115 CY 13,800xp; $, 23,77625 N/A N/A
<br /> PROJECTTOTAL C 22 GOA M
<br /> ROWD Water ualit Grant Pro ram Sultanas
<br /> Max RCWD Grant R Grant
<br /> Contractor Tota I not Amount(50%) unt Recommended
<br /> S horelin
<br /> ;e Landscaping $ 22,420.00 $ ii )in On
<br /> STAFF NOTES
<br /> While the grant request amount exceeds the standard maximum funding forte GOING Water Quality
<br /> Grant Program, this project spans 350 linear feet, which represents approximately 3.5 standard
<br /> properties(100 linear feet).
<br /> The alternative of using fieldstone (river rock) is more expensive than trap rock, but it still be more
<br /> natural looking along the shoreline, Therefore, it is recommended.
<br /> The City of Centerville is excited and highly motivated to complete this project. They are proactive and
<br /> eager to improve water quality and stabilize the bank.
<br /> RECOMMENDATION
<br /> Approve Water Quality Grant Program application for cost-share up to$11,210.00.
<br /> Page 3 of 4
<br />
|