Laserfiche WebLink
and fallen trees (see site pictures at end of memorandum). asea on this determination,the lateral <br /> recession to was estimated to be 0.3 Styr,which is on the low and of the'severe' range(0.3- 0.5 <br /> Styr). Assuming sandy soils, the estimated soil loss from this 350' stretch of bank with an average 2' <br /> eroding face is approximately 11.6 tons per year. This results in an estimated 9.82 pounds of total <br /> phosphorus contributed to Centerville Lake and downstream waterbodles,annually. Stabilization of the <br /> bank will result in 100 percent reductions in these estimated pollutant leads. <br /> ELIGIBLE EXPENSES AND REQUESTED FUNDING <br /> The grant request outlined in this section is based on the lowest of six quotes solicited from contractors <br /> by the City of Centerville. The low bidder salmon, Shoreline Landscaping, is shaded gray. See <br /> attached cost estimates for additional detail. <br /> Summary of Quotes Received <br /> ORIGINAL QUOTE FORM <br /> Contractor <br /> Carearromism Mlniiosou Native Outdoor Lab All Season Cold Stone <br /> Item QUO Held Landscelpe Land the Larrosespe Services,Inc, Shorelines <br /> Mobilization I Ls 1,ods. 5 2,750-00 1,000,00 400,00 $ 1,000.00 <br /> Traffic control-bituminous walk'ng trail and street 1i <br /> if applicable 1 1 LS CAOAIA $ 1,500,00 350.00 600 00 850-00 <br /> class III riprap(9"-18"diameter,as stiecified in <br /> MNDOT 3601)traprock 115 CV 10,3SD,00 $ 18,739.25 17,2500C, $ 21,275.110 2$ <br /> 215 ft wide Tom IV Non-Woven Geatextile fabric <br /> (Propre:Gewose Sol,or equivalent) 405 LF It 91040 $ 1,773,90 3,240.00 S 4021 0 z <br /> Site restoraVon 1 1.5 Z,Z% $ 3,80116 it 500.00 $ 2,0011 <br /> Live,dommirlt willow stakes 125 EACH I,DW` $ 1 c <br /> 74 EACH 740. EMU C 518-isu 4 888.1111 eup.ev <br /> 540 EACH 1,620VO $ 11,080,00 $ 1,798-20 $ 1,35100 1 i <br /> 28,87&00 C 29.3pis.00 $, 31,666,35 $63.356.6 <br /> ALTERNATIVES <br /> ' <br /> anConntractor <br /> up"' <br /> Cies <br /> Dreamwapas Minoes*MNallve Outdoor lob All s aold C $lease <br /> "'IS <br /> Itarra <br /> Quesdifty Urift cr fteogninLandscape tai ndscapes inc Landman. Services,Inc Shorelines 'I <br /> S' duorr , ecified in <br /> ass <br /> „„18, <br /> sta's{river at. -E <br /> 115 CY 13,800xp; $, 23,77625 N/A N/A <br /> PROJECTTOTAL C 22 GOA M <br /> ROWD Water ualit Grant Pro ram Sultanas <br /> Max RCWD Grant R Grant <br /> Contractor Tota I not Amount(50%) unt Recommended <br /> S horelin <br /> ;e Landscaping $ 22,420.00 $ ii )in On <br /> STAFF NOTES <br /> While the grant request amount exceeds the standard maximum funding forte GOING Water Quality <br /> Grant Program, this project spans 350 linear feet, which represents approximately 3.5 standard <br /> properties(100 linear feet). <br /> The alternative of using fieldstone (river rock) is more expensive than trap rock, but it still be more <br /> natural looking along the shoreline, Therefore, it is recommended. <br /> The City of Centerville is excited and highly motivated to complete this project. They are proactive and <br /> eager to improve water quality and stabilize the bank. <br /> RECOMMENDATION <br /> Approve Water Quality Grant Program application for cost-share up to$11,210.00. <br /> Page 3 of 4 <br />