Laserfiche WebLink
<br /> Contract Unit Current Quantity Amount <br />No. Item Unit Quantity Price Quantity to Date to Date <br /> Base Bid <br />1 MOBILIZATION LS 1 300.00 1 1 $300.00 <br />2 24" HDPE STORM SEWER LF 172 35.00 180 180 $6,300.00 <br />3 24" RCP STORM SEWER, CLASS 4 LF 100 75.00 82 82 $6,150.00 <br />4 24" HDPE FLARED END SECTION EA 1 197.00 1 1 $197.00 <br />5 SALVAGE & REINSTALL 24" RCP FES EA 1 300.00 1 1 $300.00 <br />6 4' DIA MANHOLE EA 1 2600.00 1 1 $2,600.00 <br />7 WOOD SKIMMER STRUCTURE EA 1 1800.00 1 1 $1,800.00 <br />8 CLASS III RANDOM RIPRAP CY 30 48.00 30 30 $1,440.00 <br />9 CLEAR AND GRUB LS 1 2000.00 1 1 $2,000.00 <br />10 DITCH EXCAVATION LF 150 5.00 120 120 $600.00 <br />11 REMOVE 24" RCP STORM SEWER PIPE LF 45 10.00 45 45 $450.00 <br />12 REMOVE & REPLACE BITUMINOUS <br /> PAVEMENT, 3" THICK SY 100 20.00 100 100 $2,000.00 <br />13 REMOVE AND REPLACE CONCRETE CURB <br /> AND GUTTER LF 70 25.00 62 62 $1,550.00 <br />14 CLASS 5 AGGREGATE BASE, 8" THICK TN 45 12.00 45 45 $540.00 <br />15 SODDING SY 400 5.00 $0.00 <br />16 SEEDING WITH WOOD FIBER BLANKET SY 400 3.50 800 800 $2,800.00 <br />17 IMPROVED PIPE FOUNDATION LF 270 8.00 270 270 $2,160.00 <br />18 SILT FENCE, REGULAR LF 100 6.00 40 40 $240.00 <br />19 COMMON BORROW (LV) CY 150 15.00 240 240 $3,600.00 <br /> Total Base Bid $35,027.00 <br />Change Order Number 1 <br />1 ADJUSTED FINAL QUANTITIES LS -1030.00 $0.00 <br /> Total Change Order No.1 $0.00 <br /> <br />Total Base Bid <br />Total Change Order No.1 <br />Total Work Completed To Date <br /> <br />$35,027.00 <br />$0.00 <br />$35,027.00 <br /> <br />6160413BREQ1 Final.xls <br />