<br /> Contract Unit Current Quantity Amount
<br />No. Item Unit Quantity Price Quantity to Date to Date
<br /> Part 1 - Sanitary Sewer
<br />1 MOBILIZATION LS 1 21000.00 $21,000.00
<br />2 CONNECT TO EXISTING MANHOLE EA 1 525.00 $525.00
<br />3 CONNECT TO EXISTING SANITARY SEWER 8" PVC PIPE EA 1 370.00 $370.00
<br />4 CORE DRILL CONNECTION TO EXISTING MANHOLE EA 1 1050.00 $1,050.00
<br />5 REMOVE AND REPLACE EXISTING SILT FENCE LF 100 3.00 $0.00
<br />6 SILT FENCE, REGULAR LF 50 2.00 $0.00
<br />7 HAY BALES EA 10 6.00 $0.00
<br />8 8" PVC SANITARY SEWER, SDR 35,0'-10' DEEP LF 316 14.70 316 $4,645.20
<br />9 8" PVC SANITARY SEWER, SDR 35,10'-12' DEEP LF 80 16.80 80 $1,344.00
<br />10 8" PVC SANITARY SEWER, SDR 35,12'-14' DEEP LF 284 18.90 314 $5,934.60
<br />11 4" PVC, SCH. 40 RISER PIPE LF 18 10.50 5 $52.50
<br />12 8" X 4" PVC WYE EA 15 48.00 15 $720.00
<br />13 CUT 4" SERVICE INTO 8" PVC EA 1 525.00 1 $525.00
<br />14 4' DIAMETER SANITARY MH, 8' DEEP EA 3 1575.00 3 $4,725.00
<br />15 4' DIAMETER SANITARY MANHOLE OVERDEPTH LF 11.5 90.00 10 $900.00
<br />16 IMPROVED PIPE FOUNDATION, PER 6" INCREMENT LF 680 3.70 680 $2,516.00
<br />17 SEEDING AC 0.5 2400.00 $0.00
<br />18 CLOSED CIRCUIT TV INSPECTION LF 710 1.00 700 700 $700.00
<br />19 CLEAR AND GRUB LS 1 2000.00 1 $2,000.00
<br /> Total Part 1 - Sanitary Sewer $47,007.30
<br /> Part 2 - Watermain
<br />20 CONN ECT TO EXISTING 8" WATER MAIN EA 2 420.00 2 $840.00
<br />21 CONNECT TO EXISTING 6" WATER MAIN EA 3 315.00 3 $945.00
<br />22 8" PVC WATER MAIN LF 475 18.00 475 $8,550.00
<br />23 6" PVC WATER MAIN LF 461 15.75 406 $6,394.50
<br />24 12" WATER MAIN OFFSET EA 1 2940.00 1 $2,940.00
<br />25 8" WATER MAIN OFFSET EA 1 1840.00 1 $1,840.00
<br />26 6" GATE VALVE AND BOX, IN PLACE EA 5 650.00 5 $3,250.00
<br />27 INSTALL HYDRANT EA 5 1575.00 5 $7,875.00
<br />28 DUCTILE IRON FITTINGS LB 625 1.30 679 $882.70
<br />29 IMPROVED PIPE FOUNDATION, PER 6" INCREMENT LF 860 0.01 $0.00
<br />30 INSULATION, 3" THICK SY 60 22.00 60 $1,320.00
<br /> Total Part 2 - Watermain $34,837.20
<br /> Part 3 - Services
<br />31 1" CORPORATION STOP EA 31 90.00 32 $2,880.00
<br />32 1" CURB STOP AND BOX EA 31 79.00 32 $2,528.00
<br />33 1" TYPE "K" COPPER WATER SERVICE LF 1320 8.00 244 1661 $13,288.00
<br />34 1" TYPE "K" COPPER WATER SERVICE DRILLED LF 90 47.25 140 $6,615.00
<br />35 CONNECT TO EXISTING SEWER SERVICE EA 14 525.00 14 $7,350.00
<br />36 4" PVC, SCH. 40 SERVICE PIPE LF 1265 7.90 1279 $10,104.10
<br /> Total Part 3 - Services $42,765.10
<br /> Part 4 - Storm Sewer
<br />37 SALVAGE APRON EA 1 210.00 1 $210.00
<br />38 CONNECT TO EXISTING STORM SEWER EA 1 260.00 1 $260.00
<br />39 21" RCP STORM SEWER, CLASS 3 LF 220 31.20 220 $6,864.00
<br />40 18" RCP STORM SEWER, CLASS 5 LF 147 27.80 149 $4,142.20
<br />41 15" RCP STORM SEWER, CLASS 5 LF 524 24.40 512 $12,492.80
<br />42 12" RCP STORM SEWER, CLASS 5 LF 76 23.10 73 $1,686.30
<br />43 21" RCP FLARED END SECTION, INCL TRASH GUARD EA 1 1140.00 1 $1,140.00
<br />44 12" RCP FLARED END SECTION, INCL TRASH GUARD EA 1 625.00 1 $625.00
<br />45 5' DIAMETER STORM CBMH EA 2 2835.00 2 $5,670.00
<br />46 5' DIAMETER STRUCTURE OVER DEPTH LF 1.2 240.00 1 $240.00
<br />47 4' DIAMETER STORM CBMH EA 6 1520.00 6 $9,120.00
<br />48 4' DIAMETER STRUCTURE OVERDEPTH LF 4.6 95.00 4 $380.00
<br />49 2' X 3' CATCH BASIN EA 2 1025.00 2 $2,050.00
<br />50 CLASS III RANDOM RIPRAP CY 20 75.00 12 $900.00
<br />51 IMPROVED PIPE FOUNDATION, PER 6" INCREMENT LF 900 3.70 900 $3,330.00
<br />52 18" CMP CULVERT LF 30 23.10 30 30 $693.00
<br />53 12" CMP CULVERT LF 20 21.00 40 40 $840.00
<br />54 18" CMP FLARED END SECTION EA 2 290.00 2 2 $580.00
<br />55 12" eMP FLARED END SECTION EA 2 230.00 2 2 $460.00
<br />56 SEEDING AC 0.1 2500.00 $0.00
<br />61602126REQ5Final.xls
<br />
|