Laserfiche WebLink
<br />2. Reinspection fees ..!It].Sll ~ 1.1Dder provisicms <br /> <br />of Section 305.8............:.....................,.......................... $61.69 per hour <br />3. Iuspections for which no fee is specifiea11y <br /> <br />~catecJ ................ ...................................... .................. $61.69 per hour <br /> <br />EXHIBIT B <br />GRADINGPERMlTFEES <br /> <br />GRADlNG FEES <br /> <br />Geneml. Fees sba11 be lISSllIlSed in 8CC01dance with the provisicms oftbis section or sba11 be as <br />set forth. in the fee schecJule adopted by the jurisdiction. <br /> <br />Plan Review Fees. When a plan or other data are requiIed to be submitted. a plan review fee sba11 <br />be paid at the time of submittius plans and specifk:ations for review. Saic1 plan review fee shall be <br />set forth in Table A33-A Separate plan review fees sbaJl apply to retainioa waDs or ~or chainago <br />structmes as n=quired elsewhere in this code. For excavation and fiB on the same site the fee sba11 be <br />based on the volume of excavation or fill, wbichever is greater. <br /> <br />Grading Permit Fees. A fee for each gmdiDg permit sba11 be paid to the Btrildiltg 00icial as set forth. <br />in Table A33-B. Separate permits and fees shan apply to remihh18 waDs or ~ chainago <br />structmes as required elsewha:e in this code. ~ shan be no sepamte charge for staDda1d termce <br />dmiDs and similar facilities. <br />TABLE A33-A GRADING PLAN REVlEWFEES <br /> <br /> <br />SO cubic yards (38.2 m3) or 1ess................................................................. No Fee <br />51 to 100 cubic yards (40 m3 to 76.5 m3)................................................... $37.01 <br />101 to 1.000 cubic yards (Tl.2 m3 to 764.6 m3)........................................ $58.28 <br />1.001 to 10.000 cubic yards (765.3 m3 to 7645.5 m3) ................................ rn.s7 <br />10.001 to 100.000 cubic yards (7646.3 to 7645.5 m3) - m.s7 for the first <br />. 10.000 cubic yards (7645.5 m3). plus $38.59 for each acJdi1imvd <br />10.000 cubic yards (7645.5 m3) or ftaction theIeof <br />100.001 to 200.000 cubic yards (7645.6 m3to 15,291.1 m3)-S424.86 for the <br />first 100.000 cubic yards (7645.5 m3). plus $20.87 for each addi1i~l <br />10.000 cubic yards (7645.5 m3) or ftaction thereof <br />200.001 cubic yards (15,291.2 m3) or DlOIe - $633.55 for the first $200.000 cubic <br />yards (15,291.1 m3). plus $11.42 for each additional 10.000 cubic years <br />(7645.5 m3) or ftaction 1bereof <br /> <br />Other Fees: <br /> <br />Additicmal plan review required by changes, additions or revisions to approved plans <br /> <br />(Jnirrimurq cbarac - ono-balfhour) ............................................. ................ $79.54 per hour* <br /> <br /> <br />-or the total hourly cost to the jurisdiction.. wbichever is the greatest. This cost shall include <br />supervision. ovedlead, equqllnent. hourly wages and ftinge benefits of the employees involved. <br />