My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-12-13 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2017
>
2017-12-13 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2017 3:09:16 PM
Creation date
12/14/2017 2:50:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUOTEFORM <br /> Centerville Trail Side Park Shoreline Stabilization <br /> Trail Side Park <br /> Centerville, MN 55038 <br /> Instructions, In the quote table on the fallov"rig page,enter unit prices which represent the <br /> cost of all materials, labor,tools,fuel,transportation and all else needed to complete the work <br /> for each line item(i.e. the Installed price). Enter an extended amount by multiplying the <br /> estimated quantity and the unit price. Sum the extended amount for all items to calculate the <br /> total quote. <br /> Total Quote$: <br /> Total Quote in ty <br /> Iiwe propose to complete consmiction by: <br /> (date) <br /> Me will not withdraw this quote for a period of 60 day& <br /> Company Name: <br /> L JQ <br /> 5' <br /> Phone Number <br /> CR <br /> Name Printed: <br /> Signature: <br /> Date: <br /> -0 Ic OJ <br /> Ajil �3,45 <br /> Page I of 2 <br /> 81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.