Laserfiche WebLink
QUOTEFORM <br /> Centerville Trail Side Park Shoreline Stabilization <br /> Trail Side Park <br /> Centerville, MN 65038 <br /> Instructions: In the quote table on the following page, enter unit prices which represent the <br /> cost of all materials, labor,tools,fuel,transportation and all else needed to complete the work <br /> for each line item (Le. the installed price). Enter an extended amount by multiplying the <br /> estimated quantity and the unit price- Sum the extended amount for all items to calculate the <br /> total quote. <br /> Total Quote <br /> Total Quote in Words: <br /> tip I�- n <br /> l propose to complete construction by: (date) rf Fitt(41 <br /> Ilwe will not withdraw this quote for a period of 60 days. <br /> Company anaee <br /> Phone Number: <br /> Name M <br /> Printed: k- J49 <br /> Signature:; 4 <br /> Date: <br /> Page I of 2 <br /> 83 <br />