Laserfiche WebLink
113073 d Avenue NE Highway 60 East <br /> ® Fridley, MN 55432 Lake Crystal, MN 56055 <br /> CRYSTEEL (763) 571-1902 (507) 726-6041 <br /> .doTRUCK F-UU[PMENT 1-800-795-1280 1-800-722-0588 <br /> TRUCK EQUIPMENT,FARTS&ACCESSORIES Fax# (763) 571-5091 Fax # (507) 726-2984 <br /> www.crysteeltruck.com <br /> AN e. -- Nr <br /> January 2, 2018 <br /> Paul Palzer <br /> City of Centerville <br /> 1880 Main Street <br /> Centerville, MN 55038-9794 <br /> Crysteel Truck Equipment is pleased to submit this quote for your approval. <br /> Ref: State contract SB-T763 <br /> Boss 9'2" DXT Steel Plow <br /> Blade Width (Straight): 110" <br /> Blade Width (V position): 99" <br /> Blade Width (Scoop): 92" <br /> Moldboard Thickness: 11 gauge steel <br /> Moldboard Height at middle: 30" high <br /> Moldboard height at ends: 38-1/2" <br /> Cutting Edge: 1/2"x 6" steel <br /> Trip Springs (Moldboard): 4 Extension Springs <br /> Trip Springs: 3 Torsion Springs (per blade half) <br /> 2"x 1-1/8"x 10" lift cylinder <br /> SmartHitch 2 <br /> SI-3 L.E.D with Ice Shield Technology <br /> SmartTouch 2 <br /> Price of Plow $ 6,526.01 <br /> Assembly of Moldboard $ 228.38 <br /> Installation $ 494.81 <br /> Light Adapter $ 101.00 <br /> (install at later date) <br /> Options: <br /> Snow Deflector Installed $ 279.56 <br /> Back Drag Installed $ 228.07 <br /> Timbrens Load Saver in Front Installed $ 298.92 <br /> Bumper Trim Kit $ TBD <br /> Labor Charge for Current Chevy/GMC or Dodge Diesel $ 150.00 <br /> Brian Reichert <br /> Subject to all applicable taxes <br /> Quote valid for 30 days <br /> 52 <br />