My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-10 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2018
>
2018-01-10 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2018 3:44:32 PM
Creation date
1/11/2018 3:40:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
113073 d Avenue NE Highway 60 East <br /> ® Fridley, MN 55432 Lake Crystal, MN 56055 <br /> CRYSTEEL (763) 571-1902 (507) 726-6041 <br /> .doTRUCK F-UU[PMENT 1-800-795-1280 1-800-722-0588 <br /> TRUCK EQUIPMENT,FARTS&ACCESSORIES Fax# (763) 571-5091 Fax # (507) 726-2984 <br /> www.crysteeltruck.com <br /> AN e. -- Nr <br /> January 2, 2018 <br /> Paul Palzer <br /> City of Centerville <br /> 1880 Main Street <br /> Centerville, MN 55038-9794 <br /> Crysteel Truck Equipment is pleased to submit this quote for your approval. <br /> Ref: State contract SB-T763 <br /> Boss 9'2" DXT Steel Plow <br /> Blade Width (Straight): 110" <br /> Blade Width (V position): 99" <br /> Blade Width (Scoop): 92" <br /> Moldboard Thickness: 11 gauge steel <br /> Moldboard Height at middle: 30" high <br /> Moldboard height at ends: 38-1/2" <br /> Cutting Edge: 1/2"x 6" steel <br /> Trip Springs (Moldboard): 4 Extension Springs <br /> Trip Springs: 3 Torsion Springs (per blade half) <br /> 2"x 1-1/8"x 10" lift cylinder <br /> SmartHitch 2 <br /> SI-3 L.E.D with Ice Shield Technology <br /> SmartTouch 2 <br /> Price of Plow $ 6,526.01 <br /> Assembly of Moldboard $ 228.38 <br /> Installation $ 494.81 <br /> Light Adapter $ 101.00 <br /> (install at later date) <br /> Options: <br /> Snow Deflector Installed $ 279.56 <br /> Back Drag Installed $ 228.07 <br /> Timbrens Load Saver in Front Installed $ 298.92 <br /> Bumper Trim Kit $ TBD <br /> Labor Charge for Current Chevy/GMC or Dodge Diesel $ 150.00 <br /> Brian Reichert <br /> Subject to all applicable taxes <br /> Quote valid for 30 days <br /> 52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.