Stantec <br /> CITY OF CENTERVILLE -2018 LOCAL WATER PLAN <br /> CAPITAL IMPROVEMENTS PLAN <br /> 8.0 CAPITAL IMPROVEMENTS PLAN <br /> 8.1 INTRODUCTION <br /> As defined in the Centerville Capital Improvements Plan, capital improvements are those <br /> projects having a life expectancy that exceeds the financing period of the item or having a total <br /> purchase price equal to or greater than $5,000. Included in the total capital improvement cost <br /> are engineering, construction, land acquisition, administration, and legal and bonding fees. <br /> 8.2 COMPLETED CAPITAL IMPROVEMENT PROJECTS <br /> In the last update of the City's LWP, released in September 2012, the City has performed <br /> capital improvement plans identified in that plan. The location of these projects is shown in <br /> Figure 11, and they are described below. <br /> 1. Downtown Stormwater Reclamation Project: A 42" trunk line sewer from the <br /> downtown area to the stormwater reclamation system was constructed. This project was <br /> completed prior to eventual redevelopment of the downtown area, which eliminates the <br /> direct discharges which exist from the downtown. The pipe is oversized for current flows. <br /> The total cost of this project was $450,000. <br /> 2. Center Oaks 2 and Royal Meadows Infiltration Features: Streets were reconstructed <br /> in two neighborhoods with the installation of water mains. Infiltration features were <br /> included. The total cost of this project was $200,000. <br /> 3. Back Yard Drainage Improvements: Improvements to backyard drainage throughout <br /> the City were made. <br /> Prior to 2012, there were capital improvement projects that were completed between 2004 <br /> (when the previous local water plan was published) and 2012 (when the most recent update <br /> was made). Improvements that were made in Centerville include: <br /> 1. Center Oaks Drainage Improvements: Stormwater diverted to alleviate cul-de-sac <br /> flooding. <br /> 2. Shad Avenue Drainage Improvements: Back yard drain tile installed, ditches <br /> regraded. <br /> 3. Peltier Lake Drive Water Quality Improvements: Direct flows into Clearwater Creek <br /> were intercepted in rain gardens. <br /> 8.29 <br /> 67 <br />