Laserfiche WebLink
Centerville 2040 Chapter 7:Water Resources <br /> .......................................................................................................... <br /> ..................................................... <br /> 2000 2010** 2020 2030 2040 Change 2010-2040 <br /> Total Population <br /> Sewered 3,712 3920 4350 4864 1,152 <br /> Unsewered 9 9 6 0 -9 <br /> Household Size* 2.76 2.72 2.64 2.56 -0.22 <br /> Total Households <br /> Sewered 1,345 1425 1590 1900 555 <br /> Unsewered 7 0 0 0 -7 <br /> Total Employment <br /> Sewered 600 700 800 900 300 <br /> Unsewered 2 2 0 0 -2 <br /> .............................................................................................. <br /> ............................................ .............. ............................... .......................... <br /> 2000 2010** 2020 2030 2040 Change 2010-2040 <br /> System Statement <br /> Avg. Annual 0.28 0.38 0.70 ?? Ask Kris from <br /> Sanitary Flow MCES annual <br /> (MGD)- billings <br /> Allowable 1.08 1.08 1.22 ?? <br /> Peak Hourly <br /> Flow (MGD)* <br /> Proposed City Projects <br /> Avg. Annual 0.292 0.395 0.491 ?? <br /> Sanitary Flow <br /> (MGD) <br /> Proposed 1.08 1.41 1.71 <br /> Allowable <br /> PHF (MGD) <br /> *from Met Council system statement forecast in 2005 <br /> "households same as actual unit count in January 2008 <br /> Justification of the population and employment numbers shown above can be found in the land <br /> use chapter. Flow projections were derived by assigning 75 gallons per capita per day for <br /> residents plus 25 gallons per employee per day working in the City. These assumptions match <br /> closely when they are applied to existing population and employment numbers and then <br /> compared to actual flow readings. <br /> Chapter 7 1 Page 5 <br />