My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-05 P & Z Packet
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2025
>
2018
>
2018-06-05 P & Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 11:31:54 AM
Creation date
6/1/2018 4:59:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Centerville 2040 <br /> CHAPTER 8- RESILIENCE AND SUSTAINABILITY <br /> As required by state statute, a municipality's comprehensive plan must also include strategies <br /> for protection of special resources, including solar access, historic preservation, and <br /> aggregate. These strategies are discussed below. <br /> SoIx Aczess <br /> The City's zoning and subdivision ordinance prevents solar collectors from being shaded by <br /> adjacent structures or vegetation and ensures that development decisions do not preclude <br /> the possible future development and use of solar energy systems. To ensure the availability <br /> of solar access,the City of Centerville will,whenever possible, protect access to direct sunlight <br /> for solar energy systems on principle structures. The City of Centerville will consider solar <br /> access in the review of site plans and planning decisions. <br /> As part of its implementation plan, the City will be developing an ordinance to regulate both <br /> architectural and ground mount solar energy systems. <br /> Map 8-1 provided by the Metropolitan Council depicts the gross solar potential for the City. <br /> Chapter 8 1 Pagel <br />
The URL can be used to link to this page
Your browser does not support the video tag.