My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-05 P & Z Packet
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2025
>
2018
>
2018-06-05 P & Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 11:31:54 AM
Creation date
6/1/2018 4:59:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Common open space <br /> Public open space <br /> 4s, Streets <br /> A <br /> ,a Off street parking and loading areas <br /> "c' Commercial use <br /> Office use <br /> Industrial use <br /> Proposed completion schedule, including staging or phasing of the development <br /> Buildable Acreage Calculations Worksheet <br /> Preliminary Grading, Drainage, and Erosion Control Plan. All elevations and contours shall be based <br /> onNAVD-1988 <br /> .....]__ Off-street parking system plan with detailed parking calculations showing that the minimum parking <br /> requirements are being met <br /> Preliminary Utility Plan <br /> Preliminary Lighting Plan <br /> A detailed traffic impact analysis of the proposed development <br /> Estimate of population to occupy the site,-with breakdown to number of children, adults and families, <br /> Application fee and escrow <br /> APPLICATIONIMUST BE PRESENTED WITH FIVE LARGE COPIES OF PLANS AND TEN <br /> CGPIESSOF PLAN'S SESE 11 X 17 <br /> Page 3 of 5 <br /> PUD Applicationdoex Vers.2014-05-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.