My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-13 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2018
>
2018-06-13 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2018 5:27:27 PM
Creation date
6/8/2018 5:20:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEWER AND WATER <br /> Trailside Park Shoreline Restoration <br /> Work is complete. A pay request is on this week's agenda. <br /> Water Supply Plan <br /> After reaching out to the Department of Natural Resources, this week, and asking about <br /> the status of our Water Supply Plan, submitted 16 months ago, we received an email with <br /> the following statement: "You can expect a letter from the DNR that incorporates Met <br /> Council's comments next week. Centerville's plan was sent to DNR's Groundwater <br /> Technical Analysis Unit for a more in-depth review. We received that completed review <br /> in May 2018. We apologize for the lengthy review time, and appreciate your patience. " <br /> On June 8, we received their comments and are responding to them. The comments were <br /> minimal and a final version of the plan should be ready soon. <br /> PUBLIC WORKS/STREETS <br /> Summer Help <br /> Here's a list of some of the activities our seasonal staff have been involved with, under <br /> the direction of Tedd Peterson. <br /> 1. Gate valve exercising <br /> 2. Hydrant flushing <br /> 3. Repair halfpipe (skate park) <br /> 4. Trim trees (city wide/trails) <br /> 5. Gate valve repair <br /> 6. Hydrant repair <br /> 7. Street patching <br /> 8. Storm pond maintenance/inspection <br /> 9. Stop sign removal/replace <br /> 10. Manhole adjustments <br /> 11. Sanitary sewer flushing <br /> Public Works Technician Position <br /> New employee, James Huisenga will begin work on July 2, 2018. <br /> Lino Lakes LaMotte Neighborhood Street and Utility Reconstruction <br /> Bids for this project came in over budget. The city is looking for ways to reduce costs <br /> and rebid. <br /> Copier <br /> The public works copier has been installed and employees have been trained. <br /> 189 <br />
The URL can be used to link to this page
Your browser does not support the video tag.