Laserfiche WebLink
• Distance to Existing Utilities <br /> • Support Building Requirements <br /> For Centerville: <br /> • Population 3,800 <br /> • Centerville has a park which could accommodate a splash pad and would have the necessary <br /> sewer and water connections in the vicinity, so as not to make site acquisition or utility extensions <br /> a large expense. <br /> • A splashpad area of 2,500 to 3,000 S.F. would provide a reasonable area to develop a variety of <br /> play zones for Tots, Teens and Families. <br /> • Locating the splash pad adjacent a children's playground equipment helps establish a destination <br /> and make the facility more attractive. <br /> • A restroom building close by that could also be used for splash pad equipment and controls for <br /> the splashpad is needed. We do not recommend locating the equipment and controls in a below <br /> grade vault. <br /> • A budget for a splash pad, not including the building of around $350,000 -$400,000 would <br /> accommodate the splash pad, concrete, equipment and controls, a little amount of landscaping <br /> some shade structures and seating. <br /> l <br /> i <br /> ( f <br /> f <br /> i <br /> t <br /> P <br /> tairite i'°:)ir uiilltiiri IIJA. <br /> 444 <br /> Jim Maland P.E. <br /> Senior Associate <br /> Phone: 651-636-4759 <br /> jim.maland@stantec.com <br />