Laserfiche WebLink
1 <br /> $140.00 10/7/2016 IDEAL SERVICE. INC. PREVENTATIVE PM WORK ON VFD'S 2016 <br /> $1,969.17 12/28/2015 HALLFIELD CONTROLS INC. SCADA-INSTALL NEW DIALER 2014 <br /> $3,836.00 10/1/2014 IDEAL SERVICE. INC. FIELD SERVICE (3 TRIPS)-POWER BOARD REPLACMENT& RIBBON 2014 <br /> CABLE SPARE PCA CONTROL 8000A <br /> $277.50 10/1/2014 IDEAL SERVICE. INC. FIELD SERVICE LABOR&TRAVEL ON 8-27-14 2014 <br /> $195.00 6/18/2014 IDEAL SERVICE. INC. PREVENTATIVE MAINT. PER ITEM -1ST PM ON VFD'S 2014 <br /> $200.00 6/5/2014 E. H. RENNER&SONS PUMP INSPECTIONS(2) 2014 <br /> $649.50 2/5/2014 NCARD ELECTRIC COMPANY REPAIR WIRING IN WELL CHEMICAL ROOM 2014 <br /> $2,069.31 4/4/2013 SAVAGE CONTROLS SCADA SOFTWARE UPGRADE 2013 <br /> $107.84 2/7/2013 SAVAGE CONTROLS SERV TO PROGRAM & INSTALL MASTER CONTROLLER 2013 <br /> $529.92 5/17/2012 SAVAGE CONTROLS SERVICE WELL#1&SCADA 2012 <br /> $747.74 3/21/2011 SCHWAB VOLLHABER WELL#2 WATER SYSTEM REPAIRS 2011 <br /> LUBRATT <br /> $321.60 6/5/2009 HYMARK ELECTRIC, INC. WELL#2 TOUBLECALL 2009 <br /> $643.92 5/8/2009 READY WATT ELECTRIC WELL HOUSE-1875 FOX RUN- REPAIRS 2009 <br /> $521.80 4/8/2009 SAVAGE CONTROLS ON SITE SERV.3-23-09&3-10-09 TO PLAN IMPROV.TO SCADA 2009 <br /> SYST E M <br /> $526.10 2/11/2009 SAVAGE CONTROLS SERVICE PERFORMED ON WELL#2 2009 <br /> $1,868.00 6/5/2008 NCARD ELECTRIC COMPANY WELL HOUSE TRANSFORMER 2008 <br /> $6,179.50 1/11/2006 E. H. RENNER&SONS WELL#2 2006 <br /> 89 <br />