Laserfiche WebLink
��M 11I.X11PIII.�AIZ III 111:.�Amc 111.! O <br /> Grant County Sheriffs Office,Social Services, Public Health,and Emergency <br /> Management Study and Master Facilities Needs Assessment <br /> Elbow Lake,Minnesota <br /> The LEO A DALY team conducted a space needs inventory for the identified facilities/ <br /> departments,projected growth needs for now and into the future and developed a cost <br /> projection for the adequate square footage for these departments. It was identified <br /> that the Sheriff's Office is undersized with an opportunity to consider consolidating <br /> with municipal police departments and EOC space. Solutions were provided to give <br /> the County u Master Plan for future renovation and facility consolidation.The result <br /> Included renovated facilities,the elimination of two facilities from County maintenance Grant County <br /> and the potential toreturn those facilities tothe tax rolls. <br /> Carver County Master Facilities Plan <br /> Carver County,Minnesota <br /> The County commissioned LEO A DALY to conduct a comprehensive assessment of <br /> 14departnnentooftheuoun\y,ino|udingCuurto,Sheriffa'andHumanServioeo. aowe|| <br /> as Administration and support services.The work re-planned various departments to <br /> solve operational and growth needs,and to better organize the facilities for safety and <br /> public use.The assessment reviewed 7 buildings across the community and provided <br /> growth and space recommendations for the re-organization,renovation and expansion <br /> offacilities toaccommodate the 2Oyear growth needs. <br /> Hastings Police/City Hall Needs Assessment Carver County <br /> Hastings,Minnesota <br /> LEO ADALYwas commissioned toperform afull assessment and program of <br /> the historic Courthouse facility and the adjacent police facility.The assessment <br /> reviewed interior environments,operational efficiencies,safety,security,defensible <br /> office environments,movement control and integrated best practices for operational <br /> improvements to both facilities.The multi-phased renovation project will proceed over <br /> efew years. <br /> City ofSterling,Illinois,City Hall and Police Department Renovation Hastings <br /> Sterling,Illinois <br /> The city of Sterling's Coliseum Building,originally constructed in 1930,was renovated <br /> to house the city hall and police department.The updated design accommodates city <br /> administrative functions and significantly renovates the police department spaces <br /> already located on the lower level.The project transforms the historic auditorium space <br /> into contemporary offices and event areas.The auditorium's seating spaces were <br /> transformed into council chambers and offices exercising an efficient use of the wood <br /> floor,which was in excellent shape.The stage was removed to provide adjacent space <br /> for work and storage functions. <br /> City ofBayport Fire Station Ster|iIng <br /> Bayport,Minnesota <br /> The new Bayport Fire Hall replaces a6.630SFstation built inthe 1040uthat nolonger <br /> met the needs of the community.The facility consists of a 18,150-SF one-story plus <br /> mezzanine with five(double deep) apparatus bays that accommodate pull through <br /> capability with ten bay doors. <br /> Training features include: stair tower with repelling capabilities,rescue balcony, <br /> confined space shaft,breaching doors and windows,roof venting,smoke mezzanine � <br /> and caged ladder,which provide realistic simulation of the hazardous situations faced <br /> by firefighters on a regular basis.The project also includes new offices and storage, <br /> expansion space for apparatus and gear,equipment storage, laundry and mechanical Bayport <br /> shop,dayruonnand dorm suites. <br /> LEO A��LY <br /> �� <br />