Laserfiche WebLink
Proposed <br /> Timeline <br /> =� ��=~ Schedule�� � <br /> ���� ����� � �������� ��� ��� .�������� <br /> � � ��r��,��n������ � ��� ������ ��� ��� ��� = ���� =�'��= ���~�"����� <br /> Our process is based upon the duration of similar studies and comprised of three primary parts that build upon the <br /> previous. Prior tobeginning the effort,vvewill conduct akick-off discussion with the City toconfirm the process, <br /> schedule, participants and activities of the effort, and will return a revised schedule within two business days. <br /> PHASE <br /> VVepropose the following schedule and fees: <br /> Part A: Facility Assessment: 2-3 Weeks $2,000 <br /> ^ Meeting: Building walk through;equipment inventory, low <br /> voltage assessment <br /> ^ <br /> Existing building documentation update <br /> ^ <br /> Operational analysis <br /> ^ <br /> Preliminary option evaluation discussion <br /> Part 13: Facility Planning Options 2-3 Weeks $2,000 <br /> ^ Meeting: Review menu ofoptions <br /> ^ <br /> Cost assessments <br /> Final Report 2-3 Weeks $1,500 <br /> Part Aand Bnot toexceed reinnburaab|ea $400 <br /> (4vehicle trips at approximately$50/trip+$200 printing ooete) <br /> Total Fee 6-9 Weeks A5.900 <br /> All applicable parts will be collected and bound to provide a comprehensive report in a hard copy and PDF format. <br /> Reimbursable costs at 1.10times actual costs <br /> LEO A��LY <br /> 7� <br />